Dundee West Wind
146.44 MW generation in Wilbarger, TX · In queue since January 2023 · Proposed COD December 2027
146.44 MW
Capacity
1
Components
Wind
3y 10m
In Queue
IA Executed
IA Phase
Signed Feb 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 1m
IA → COD
2y 10m
Total Duration
2y 1m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Started, IA
Project under construction
Typical: 18–36 months
Proposed COD: 2027-12-31
Projected COD moved
1 time
Jul 2027 → Dec 2027
Net change
+5 months
first report to latest
Capacity
308 → 146 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Proposed commercial operation date per ERCOT capacity planning
ercot.comResearch sources and reasoning (5 recorded sources)
medium confidence at research time
- interconnection.fyi/project/ercot-27inr0004
- ercot.com/files/docs/2026/03/05/Capacity-Changes-by-Fuel-Type-Charts_February_2026.xlsx
- ercot.com/files/docs/2026/02/05/Capacity-Changes-by-Fuel-Type-Charts_January_2026.xlsx
- ercot.com/files/docs/2026/01/08/Capacity-Changes-by-Fuel-Type-Charts_December_2025.xlsx
- ercotqueue.com/developer/felix-2-llc
Commercial operation date: LBNL queue snapshot shows proposed COD of December 31, 2027. Multiple ERCOT capacity charts from Nov 2025 through Mar 2026 consistently confirm 2027 target. No contradictory news sources found.
Developer: Only source is LBNL filing entity 'Felix 2, LLC'. No press releases, corporate announcements, or news coverage found to identify a parent operating company. Entity appears to be project-specific developer.
Status: LBNL shows 'Active' status with IA executed on 2025-02-21. ERCOT capacity charts consistently list project as active with 2027 target through Q1 2026.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Dundee North Wind project is a proposed 307.72 MW wind generation facility in Wilbarger County, Texas. Developed by Felix 2, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0004, with a queue entry date of January 3, 2023.
The proposed commercial operation date for Dundee North Wind is December 31, 2027. The project's interconnection status is currently in the Facility Study phase, and the point of interconnection is the 345 kV Riley Substation, operated by AEP. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Wilbarger
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Felix 2, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
345 kV Riley Substation (#6101); AEP
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- ELECTRAW_1_2
- POI Substation
- Riley Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.