PHOTON BESS REPOWERING (ERCOT-26INR0725) — Project Summary

Queue ID
ERCOT-26INR0725
Capacity
305.48 MW
Technology
Battery
Status
active
Location
Wharton, TX
Region
ERCOT
Developer
GulfStar Power, LLC
IA Status
—

PHOTON BESS REPOWERING

ERCOT-26INR0725BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

305.48 MW hybrid in Wharton, TX · In queue since November 2025 · Proposed COD August 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

305.48 MW

Capacity

0

Components

1 year

In Queue

—

IA Status

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1y 9m

Pre-Study0%
Queue EntryNov 5, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-08-17

Queue history
26INR0725 · 12 monthly ERCOT reports, Oct 2025 – Sep 2026

Projected COD moved

2 times

Jan 2027 → Aug 2027

Net change

+7 months

first report to latest

Capacity

0 → 305 MW

changed in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedNov 5, 2025
Facilities study approvedSep 23, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Aug 17, 2027
From queue filing
Developer in saved assessment
GulfStar Power, LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue: SS completed, FIS started, no IA yet (ERCOT data as of 2026-09-01). The project is a BESS repowering at the existing Photon Solar site, with POI at the Waterh 345kV station.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. app.nrgmap.com/queues/ercot-26inr0725
  2. ercotqueue.com/project/26INR0725
  3. ercotqueue.com/developer/gulfstar-power-llc
  4. cleanview.co/planned-battery-projects/TX/26INR0725/photon-bess-repowering
  5. interchange.puc.texas.gov/search/documents/?controlNumber=35077&itemNumber=2316

Commercial operation date: Only the queue-derived proposed COD of 2027-08-17 exists (NRG Map mirrors it). Cleanview's 'expected online 2027' and 'May 2027' are aggregator listings, not developer or press-release targets, so they don't count as independent post-LBNL signals.

Developer: Every source names GulfStar Power, LLC, but they all draw on the ERCOT queue data. No parent company or acquirer was found. ERCOTQueue lists GulfStar with 7 projects on file (2 active, 5 commissioned), so it appears to be an operating developer rather than a pure shell.

Status: NRG Map, using ERCOT status data as of 1 September 2026, shows the project active with FIS started and no IA. No news reports a withdrawal, suspension or construction start. A PUC filing for an SGIA amendment covering Photon Solar and BESS Repowering exists but is undated and is not a new IA for this queue position.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The PHOTON BESS REPOWERING project is a proposed 305.48 MW hybrid battery energy storage development in Wharton County, Texas. Developed by GulfStar Power, LLC, the project consists of battery energy storage and other unspecified technologies. It is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0725, with a queue entry date of November 5, 2025, and a proposed commercial operation date of May 17, 2027.

The project's point of interconnection (POI) is the 44880 Waterh_POI_5 345kV location.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Wharton

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

GulfStar Power, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

44880 Waterh_POI_5 345kV

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.