Key City Solar SLF (ERCOT-26INR0701) — Project Summary

Queue ID
ERCOT-26INR0701
Capacity
989.1 MW
Technology
Solar
Status
active
Location
Taylor, TX
Region
ERCOT
Developer
Key City Solar LLC
IA Status
—

Key City Solar SLF

ERCOT-26INR0701BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

989.1 MW generation in Taylor, TX · In queue since July 2025 · Proposed COD March 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

989.1 MW

Capacity

0

Components

1y 4m

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 8m

Pre-Study0%
Queue EntryJul 7, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-03-31

Queue history
26INR0701 · 7 monthly ERCOT reports, Mar 2026 – Sep 2026

Projected COD moved

0 times

Mar 2029 → Mar 2029

Net change

0 months

first report to latest

Capacity

1011 → 989 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 7, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Mar 31, 2029
From queue filing
Developer in saved assessment
Key City Solar LLC
From queue filing
Status at research time
Active
Active in ERCOT queue, in study with no interconnection agreement (IA) yet; no construction or permitting announcements found.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. ercotqueue.com/project/26INR0701
  2. cleanview.co/power-projects/planned/solar-farms/texas/26INR0701/key-city-solar-slf
  3. infrasure.ai/ask/r/city-of-pratt-solar
  4. interconnection.fyi/project/ercot-26inr0701
  5. datacenters.prithvidixit.com/facilities/crusoe-abilene-expansion-abilene-tx

Commercial operation date: The only COD signal is the LBNL proposed date of 2029-03-31. Aggregator sites (Cleanview 'Expected online March 2029', Infrasure 'Proposed COD is 2029-03') repeat the ERCOT filing and are not independent confirmation. No developer press release or news gives a different date.

Developer: Every source, including ERCOT queue trackers, names Key City Solar LLC as developer. None identifies a parent or operating company, so the project-LLC name is the only available answer.

Status: LBNL lists the project as active. ERCOT queue trackers show 'No IA' and 'In study', which is consistent with early-stage status. ercotqueue.com puts build-chance at 5%.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Key City Solar SLF is a proposed solar photovoltaic generation project located in Taylor County, Texas. Developed by Key City Solar LLC, the project has a planned total capacity of 989.1 megawatts (MW), which would place it among the larger solar development projects proposed within the Electric Reliability Council of Texas (ERCOT) region. The project is planned to interconnect to the grid at the Abilene Mulberry Creek 345 kV point of interconnection (designated 6235 Abilene Mulberry Creek 345).

The project is listed in the ERCOT interconnection queue under the identifier ERCOT-26INR0701, with a queue entry date of July 7, 2025. Its interconnection request is currently classified as active. Key City Solar SLF has a proposed commercial operation date of March 31, 2029. The available queue data does not indicate the status of an interconnection agreement for the project.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Taylor

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Key City Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

6235 Abilene Mulberry Creek 345

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.