Staghorn Gas (ERCOT-26INR0698) — Project Summary

Queue ID
ERCOT-26INR0698
Capacity
9.99 MW
Technology
Gas
Status
active
Location
Ward, TX
Region
ERCOT
Developer
RPC Merchant LLC
IA Status
IA Executed

Staghorn Gas

ERCOT-26INR0698BetaActiveGasERCOTLBNL

9.99 MW generation in Ward, TX · In queue since May 2025 · Proposed COD May 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

9.99 MW

Capacity

1

Components

Gas

1y 6m

In Queue

IA Executed

IA Phase

Signed May 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

<1 month

IA → COD

1 year

Total Duration

<1 month

Schedule

7 months past proposed COD

Construction75%
Queue EntryMay 29, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementMay 30, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2026-05-02

Queue history
26INR0698 · 12 monthly ERCOT reports, Oct 2025 – Sep 2026

Projected COD moved

1 time

May 2026 → Oct 2026

Net change

+5 months

first report to latest

Capacity

10 MW

unchanged in the reports

Latest stage

Synchronized

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Interconnection agreement signedMay 30, 2025
Approved for energizationSep 2, 2026
Approved for synchronizationSep 18, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Staghorn Gas is a proposed natural gas-fired generation project located in Ward County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Developed by RPC Merchant LLC, the project has a total planned capacity of 9.99 MW, consisting entirely of gas-fired generation. The project's point of interconnection is the Staghorn station, connecting at 138 kV transmission voltage via the TNMP transformer T3 (load name STGHRN_3, bus number 37990, node 9984).

The project is listed in the ERCOT interconnection queue under queue ID ERCOT-26INR0698 and holds an active status. It entered the queue on May 29, 2025, and executed its interconnection agreement the following day, on May 30, 2025. The proposed commercial operation date is May 2, 2026. Staghorn Gas has been linked to an existing operating plant in U.S. Energy Information Administration (EIA) records, also named Staghorn Gas (EIA plant ID 69271), with a match confidence of 0.88.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Ward

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

RPC Merchant LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

STATION NAME: STAGHORN LOAD NAME: STGHRN_3 TNMP TRANSFORMER NAME: T3 BUS #: 37990 TRANSMISSION VOLTAGE: 138KV NODE: 9984

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
HIGH
Nearest Node (Estimated)
SWOOSE1_U1

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.