Tennuto BESS (ERCOT-26INR0598) — Project Summary

Queue ID
ERCOT-26INR0598
Capacity
202 MW
Technology
Battery
Status
active
Location
Cooke, TX
Region
ERCOT
Developer
Tennuto BESS, LLC
IA Status
Facility Study

Tennuto BESS

ERCOT-26INR0598BetaActiveBatteryERCOTLBNL

202 MW storage in Cooke, TX · In queue since January 2025 · Proposed COD December 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

202 MW

Capacity

1

Components

Battery

1y 10m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 11m

Facilities Study50%
Queue EntryJan 28, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-31

Queue history
26INR0598 · 18 monthly ERCOT reports, Jan 2025 – Jun 2026

Projected COD moved

1 time

May 2027 → Dec 2027

Net change

+7 months

first report to latest

Capacity

202 MW

unchanged in the reports

Latest stage

Cancelled

last listed Jun 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 28, 2025
CancelledJul 10, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 31, 2027
From queue filing
Developer in saved assessment
Tennuto BESS, LLC
From queue filing
Status at research time
Active
Active — Facility Study phase in ERCOT queue, no construction timeline announced
Financing
Not recorded

Milestones in this assessment

IA executedJan 28, 2025Latest in this assessment

Project entered ERCOT queue on 2025-01-28 at Facility Study phase

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of 2027-12-31. No independent news or press releases found to validate or contradict this date.

Developer: Only LBNL filing entity 'Tennuto BESS, LLC' is available. No news coverage or corporate announcements found to identify a parent operating company or confirm this is a project-specific LLC.

Status: LBNL status shows 'active' with Facility Study phase. No public announcements or news coverage found to provide additional ground-truth status updates.

About

Saved background

Generated Apr 10, 2026 · Predates Jun 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Tennuto BESS project is a proposed 202 MW hybrid battery energy storage system located in Cooke County, Texas. Developed by Tennuto BESS, LLC, the project is interconnected within the ERCOT region and entered the ERCOT interconnection queue (ERCOT-26INR0598) on January 28, 2025. The proposed commercial operation date is December 31, 2027.

The project, which is currently listed as active in the queue, consists of battery energy storage paired with another unspecified technology. The point of interconnection is at Wolfridge (#730). The Tennuto BESS project has appeared in recent news coverage regarding energy storage development in Texas.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Jun 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Cooke

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Tennuto BESS, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Wolfridge (#730)

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.