Electric E - West Texas Generation 2 (ERCOT-26INR0597) — Project Summary

Queue ID
ERCOT-26INR0597
Capacity
—
Technology
Gas
Status
active
Location
Midland, TX
Region
ERCOT
Developer
Electric E Power Marketing
IA Status
—

Electric E - West Texas Generation 2

ERCOT-26INR0597BetaActiveGasCombustion (gas) TurbineERCOTLive · ERCOT

— generation in Midland, TX · In queue since December 2024 · Proposed COD September 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

—

Capacity

0

Components

1y 10m

In Queue

—

IA Status

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 9m

Pre-Study0%
Queue EntryDec 19, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-19

About

Electric E - West Texas Generation 2 (queue ID ERCOT-26INR0597) is a proposed natural gas-fired generation project in Midland County, Texas. Electric E Power Marketing is developing the project, which would use combustion (gas) turbine technology. The submitted data does not specify a capacity figure. The project is planned to connect to the grid at the #18664 SHAWPD 138kV point of interconnection.

The project is in the interconnection queue of the Electric Reliability Council of Texas (ERCOT). It entered the queue on December 19, 2024, and its status is active. Its proposed commercial operation date is September 19, 2028. The available data does not report the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Midland

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Electric E Power Marketing

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

#18664 SHAWPD 138kV

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Electric E - West Texas Generation 2
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.