Texas Cotton Solar (ERCOT-26INR0568) — Project Summary

Queue ID
ERCOT-26INR0568
Capacity
201.6 MW
Technology
Solar
Status
active
Location
Brazos, TX
Region
ERCOT
Developer
RWE Solar Development, LLC
IA Status
Facility Study

Texas Cotton Solar

ERCOT-26INR0568BetaActiveSolarERCOTLBNL

201.6 MW generation in Brazos, TX · In queue since October 2024 · Proposed COD December 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

201.6 MW

Capacity

1

Components

Solar

2y 1m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 2m

Facilities Study50%
Queue EntryOct 1, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-31

Queue history
26INR0568 · 16 monthly ERCOT reports, Oct 2024 – Jan 2026

Projected COD moved

1 time

Dec 2026 → Dec 2028

Net change

+24 months

first report to latest

Capacity

202 MW

unchanged in the reports

Latest stage

Cancelled

last listed Jan 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 1, 2024
CancelledFeb 4, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 31, 2028
From queue filing
Developer in saved assessment
RWE
Filed as RWE Solar Development, LLC
Status at research time
Active
Active — early-stage Facility Study phase, no construction timeline announced
Financing
Not recorded

Milestones in this assessment

IA executedOct 2024Latest in this assessment

Entered ERCOT queue in Facility Study phase

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of 2028-12-31. No independent news or press releases found to validate or update this target date.

Developer: LBNL filing entity is 'RWE Solar Development, LLC' which is the project development subsidiary of RWE, a major German utility and renewable energy developer. The parent operating company is RWE.

Status: LBNL shows 'active' status in Facility Study phase as of October 2024 queue entry. No public announcements found regarding permitting, financing, or construction milestones.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Texas Cotton Solar project is a proposed 201.6 MW solar generation facility in Brazos County, Texas. Developed by RWE Solar Development, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0568, with a queue entry date of October 1, 2024. The proposed commercial operation date is December 31, 2026.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 345kV 975 Jack_Creek - 967 Gibbons Creek. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Jan 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Brazos

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

RWE Solar Development, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 975 Jack_Creek - 967 Gibbons Creek

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.