Hobby BESS I (ERCOT-26INR0546) — Project Summary

Queue ID
ERCOT-26INR0546
Capacity
602.56 MW
Technology
Battery
Status
active
Location
Harris, TX
Region
ERCOT
Developer
Airport Storage II LLC
IA Status
Facility Study

Hobby BESS I

ERCOT-26INR0546BetaActiveBatteryERCOTLBNL + Live

602.56 MW storage in Harris, TX · In queue since September 2024 · Proposed COD October 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

602.56 MW

Capacity

1

Components

Battery

2y 2m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 1m

Facilities Study50%
Queue EntrySep 4, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Completed, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-10-15

Queue history
26INR0546 · 26 monthly ERCOT reports, Aug 2024 – Sep 2026

Projected COD moved

1 time

Jul 2026 → Oct 2027

Net change

+15 months

first report to latest

Capacity

603 → 603 MW

changed in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 4, 2024
Facilities study approvedJan 20, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Oct 15, 2027
From queue filing
Developer in saved assessment
—
From queue filing
Status at research time
Active
Active in ERCOT queue at Facility Study stage with no executed IA (ercotqueue.com shows 'No IA', build-chance 14%); no evidence of construction or financing.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-26inr0546
  2. ercotqueue.com/project/26INR0546
  3. cleanview.co/power-projects/planned/battery-storage-projects/texas/26INR0546/hobby-bess-i
  4. ercotqueue.com/developer/airport-storage-ii-llc
  5. interxdata.com/projects/hobby-bess-i-ercot-gis-report-26inr0546/

Commercial operation date: Only queue-derived data exists. The interconnection.fyi mirror of the ERCOT filing lists a proposed completion of October 15, 2027, and Cleanview says 'Expected online 2027'. Neither is an independent developer-backed signal, and no press release or news confirms a financing-backed date.

Developer: Every source names only the shell LLC, Airport Storage II LLC, which has one project on file. No press release or parent company was found, so the operating developer cannot be determined.

Status: LBNL and the queue mirrors (interconnection.fyi, ercotqueue.com) agree the project is active and not operational. The interxdata snippet saying 'operational' conflicts with them and looks like a data-aggregator error, since the project has no IA and a 2027 proposed COD.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Hobby BESS I is a proposed battery storage project located in Harris County, Texas, within the ERCOT region. The project, developed by Airport Storage II LLC, has a total capacity of 602.88 MW. It consists entirely of battery storage.

The project is listed in the ERCOT interconnection queue as entry ERCOT-26INR0546, with a queue entry date of September 4, 2024. Its proposed commercial operation date is October 15, 2027. The project's interconnection agreement status is currently in the Facility Study phase. The point of interconnection is the Double Tap 138kV 42680 Garden Villas _x0013_ 48250 Hall & 42680 Garden Villas _x0013_ 48013 Chocolate Bayou.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Harris

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Airport Storage II LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Double Tap 138kV 42680 Garden Villas – 48250 Hall & 42680 Garden Villas – 48013 Chocolate Bayou

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.