Comanche Creek generating station (ERCOT-26INR0537) — Project Summary

Queue ID
ERCOT-26INR0537
Capacity
107 MW
Technology
Gas
Status
active
Location
Pecos, TX
Region
ERCOT
Developer
Longfellow Power LLC
IA Status
Facility Study

Comanche Creek generating station

ERCOT-26INR0537BetaActiveGasERCOTLBNL + Live

107 MW generation in Pecos, TX · In queue since July 2024 · Proposed COD December 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

107 MW

Capacity

1

Components

Gas

2y 4m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 5m

Facilities Study50%
Queue EntryJul 1, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-31

Queue history
26INR0537 · 27 monthly ERCOT reports, Jul 2024 – Sep 2026

Projected COD moved

2 times

Mar 2026 → Dec 2027

Net change

+21 months

first report to latest

Capacity

107 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 1, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 20 months ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneMission 2030 launchInside Climate News · 2025-03-27
Expected COD2030Inside Climate News · 2025-03-27

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 31, 2027
From queue filing
Developer in saved assessment
Longfellow Power LLC
From queue filing
Status at research time
Active
Active — Facility Study phase in ERCOT queue as of July 2024, no public construction or financing announcements
Financing
Not recorded

Milestones in this assessment

IA executedJul 2024Latest in this assessment

Entered ERCOT interconnection queue, Facility Study phase

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of 2027-12-31. No independent news or press releases found to validate or contradict this date.

Developer: Only LBNL filing identifies Longfellow Power LLC as developer. No news coverage or corporate information found to determine if this is a shell LLC or operating entity, or to identify any parent company.

Status: LBNL status shows Active with Facility Study in progress. No news coverage found to indicate project advancement beyond interconnection study phase.

Project lifecycle
as of 2025-09-29
TechnologygasUtility Dive · 2025-09-29
DeveloperVistraUtility Dive · 2025-09-29

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The proposed Comanche Creek generating station is a 107 MW natural gas project located in Pecos County, Texas. Developed by Longfellow Power LLC, the project is currently in the ERCOT interconnection queue as entry ERCOT-26INR0537, with a queue entry date of July 1, 2024. The proposed commercial operation date is December 31, 2027, and the project's interconnection status is currently in the Facility Study phase.

The Comanche Creek generating station has been the subject of recent news coverage, with 45 articles appearing in the press. These articles primarily focus on industry trends and deals related to the project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Pecos

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Longfellow Power LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

TNCENTRY1_1 [138 kV] ( 38431)

Data Source

LBNL + Live

DeveloperHoltec InternationalInside Climate News · 2025-03-27
TransactionPPAPower Engineering · 2025-09-30
Offtakerlarge, investment grade companyUtility Dive · 2025-09-29
PPA structurePhysicalPower Engineering · 2025-09-30
PPA term20 yearsPower Engineering · 2025-09-30
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (3)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.