Sky Global West Houston
324.58 MW generation in Austin, TX · In queue since July 2024 · Proposed COD June 2028
324.58 MW
Capacity
1
Components
Gas
2y 4m
In Queue
IA Executed
IA Phase
Signed Mar 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
8 months
IA → COD
3y 3m
Total Duration
8 months
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Completed, IA
Project under construction
Typical: 24–48 months
Proposed COD: 2028-06-01
Projected COD moved
2 times
Dec 2026 → Jun 2028
Net change
+18 months
first report to latest
Capacity
325 MW
unchanged in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/natural-gas-power-plants/texas/26INR0519/sky-global-west-houston
- cleanview.co/power-projects/developers/sky-global-partners
- interchange.puc.texas.gov/Documents/21072_96_1580126.PDF
- interconnection.fyi/projects/market/ERCOT
Commercial operation date: LBNL proposed COD is 2028-06-01 and Cleanview independently lists the project as 'Expected online 2028'. A Jan 2026 PUC Interchange listing shows 'Jun-27' for this project, but that is a single signal and does not outweigh LBNL plus Cleanview, so the 2028 date is kept with a possible ~1-year-earlier flag.
Developer: LBNL files the project under the project LLC 'Sky Global Power Two, LLC'. Cleanview's developer page lists Sky Global West Houston (325 MW gas, TX) in the pipeline of Sky Global Partners, the apparent sponsor.
Status: LBNL shows an active queue entry with IA Executed, and ERCOT/interconnection trackers list the project as Active. No source reports construction, cancellation or withdrawal.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Sky Global West Houston is a proposed 324.58 MW natural gas generation project located in Austin County, Texas. The development project, sponsored by Sky Global Power Two, LLC, is currently in the ERCOT interconnection queue as entry ERCOT-26INR0519, with a queue entry date of July 1, 2024. The project's proposed commercial operation date is June 1, 2027, and its interconnection agreement status is currently in the Facility Study phase.
The proposed project connects to the tap 138kV 44700 Gebhardt - 44740 Wallis circuit 65. The Sky Global West Houston project has been the subject of recent news coverage, with three articles categorized as regulatory and industry news.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Austin
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Sky Global Power Two, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
tap 138kV 44700 Gebhardt - 44740 Wallis circuit 65
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Sky Global West Houston
Data-driven briefing on Sky Global West Houston — fleet, generation, financial, and news signals.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.