County Road BESS
9.9 MW storage in Reeves, TX · Proposed COD March 2026
9.9 MW
Capacity
1
Components
Battery
—
In Queue
IA Executed
IA Phase
Signed Jan 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
IA → COD
1y 2m
Schedule
8 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 6–18 months
Proposed COD: 2026-03-31
Projected COD moved
6 times
Jan 2026 → Aug 2026
Net change
+7 months
first report to latest
Capacity
10 MW
unchanged in the reports
Latest stage
Commercial operation
last listed Jun 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
County Road BESS is a proposed battery energy storage project located in Reeves County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Developed by County Rd Infra LLC, the standalone storage project has a total capacity of 9.9 MW, consisting entirely of a single battery component. The project is planned to interconnect at the County Road substation (County Road Sub TNP) at the 138 kV level, identified in ERCOT records as bus number 38047.
The project is listed in the ERCOT interconnection queue under queue ID ERCOT-26INR0512 and currently holds an active status. An interconnection agreement (IA) has been executed, with an IA date of January 1, 2025. The proposed commercial operation date is March 31, 2026. The project has also been linked with high confidence to an existing operating plant record in the U.S. Energy Information Administration (EIA) database, matched to the plant named County Road BESS (EIA plant ID 69422).
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Jun 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Reeves
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
County Rd Infra LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
COUNTY ROAD COUNTY ROAD SUB TNP 138kv CNTYRDS Bus # 38047 Load Name - CNTYRD_1
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- CNTYRDS_RN
- POI Substation
- Stafford Boulevard Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about County Road BESSForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.