Symphony BESS
612 MW storage in Austin, TX · In queue since February 2025 · Proposed COD July 2028
612 MW
Capacity
1
Components
Battery
1y 9m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 5m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-07-01
Projected COD moved
1 time
May 2027 → Jul 2028
Net change
+14 months
first report to latest
Capacity
612 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Queue-reported proposed completion date moved from 2027-05-10 to 2028-06-30 (reported April 2025).
newsletter.interconnection.fyiResearch sources and reasoning (4 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/texas/26INR0466/symphony-bess
- interconnection.fyi/project/ercot-26inr0466
- newsletter.interconnection.fyi/p/interconnection-weekly-project-updates-ad5
- bizapedia.com/tx/symphony-bess-llc.html
Commercial operation date: The only COD signal is the ERCOT queue date, which the aggregators repeat. The interconnection.fyi newsletter reports 'Proposed completion changed from May 10, 2027 to June 30, 2028', which matches LBNL's 2028-07-01. No developer press release or financing-backed target exists.
Developer: The only developer name is the project LLC from the queue filing. The Bizapedia entry shows the LLC is registered in Austin, TX but names no parent or operating company, so a parent cannot be identified.
Status: LBNL lists the project as active with a facility study in progress. interconnection.fyi also shows it active in ERCOT, and nothing suggests withdrawal or construction.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Symphony BESS project is a proposed 612 MW battery storage project located in Austin County, Texas. Developed by Symphony BESS, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0466. The proposed commercial operation date is July 1, 2028, and the project's interconnection status is currently in the Facility Study phase.
The Symphony BESS project consists entirely of battery storage, with a total capacity of 612 MW. The point of interconnection (POI) for the project is at the 46220 PETERS substation. The project has appeared in recent news coverage regarding energy storage developments in Texas.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Austin
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Symphony BESS, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
46220 PETERS
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- MEDIUM
- POI Substation
- Peters Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.