Hamby Solar (ERCOT-26INR0440) — Project Summary

Queue ID
ERCOT-26INR0440
Capacity
205.8 MW
Technology
Solar
Status
active
Location
Jones, TX
Region
ERCOT
Developer
Abilene GCE LLC
IA Status
Facility Study

Hamby Solar

ERCOT-26INR0440BetaActiveSolarERCOTLBNL + Live

205.8 MW generation in Jones, TX · In queue since March 2024 · Proposed COD June 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

205.8 MW

Capacity

1

Components

Solar

2y 4m

In Queue

Facility Study

IA Phase

Signed Dec 2025

Interconnection

Queue → IA

1y 9m

IA → COD

2y 6m

Total Duration

1y 9m

Construction50%
Queue EntryMar 22, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementDec 31, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2028-06-27

Cross-source intelligence
Beta
Medium confidence·4 sources·as of 2026-06-01
Expected COD
2028-06-27
From queue filing
Developer
Abilene GCE LLC
From queue filing
Status
Active
Active — Facility Study phase with IA date target of 2025-12-31, no construction announcements yet
Financing
Unannounced
Key milestones
IA executedDec 31, 2025

Target IA execution date per LBNL queue filing, interconnection agreement with AEP Texas

source
COD targetJun 27, 2028Most recent

Proposed commercial operation date confirmed in ERCOT MORA report

source
About

The Hamby Solar project is a proposed 71.4 MW solar generation facility located in Jones County, Texas. The project, developed by Abilene GCE LLC, is currently in the ERCOT interconnection queue as entry ERCOT-26INR0440, with a queue entry date of March 22, 2024.

The proposed commercial operation date for Hamby Solar is June 27, 2028. Its interconnection status is currently in the Facility Study phase. The point of interconnection is the 6245 ABILENE ROBERTSON PRISON 69 KV.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Jones

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Abilene GCE LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

6245 ABILENE ROBERTSON PRISON 138 KV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Hamby Solar
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.