GAMAY ENERGY STORAGE (ERCOT-26INR0417) — Project Summary

Queue ID
ERCOT-26INR0417
Capacity
418.6 MW
Technology
Battery
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
GAMAY ENERGY STORAGE LLC
IA Status
IA Executed

GAMAY ENERGY STORAGE

ERCOT-26INR0417BetaActiveBatteryERCOTLBNL + Live

418.6 MW storage in Brazoria, TX · In queue since February 2024 · Proposed COD January 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

418.6 MW

Capacity

1

Components

Battery

2y 9m

In Queue

IA Executed

IA Phase

Signed May 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 3m

IA → COD

2y 8m

Total Duration

1y 3m

Construction75%
Queue EntryFeb 7, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementMay 27, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-01-01

Queue history
26INR0417 · 33 monthly ERCOT reports, Jan 2024 – Sep 2026

Projected COD moved

3 times

Jan 2026 → Jan 2028

Net change

+24 months

first report to latest

Capacity

419 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 7, 2024
Facilities study approvedOct 17, 2024
Interconnection agreement signedMay 27, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jan 1, 2028
From queue filing
Developer in saved assessment
—
From queue filing
Status at research time
IA Executed
Active in ERCOT queue with an executed interconnection agreement (2025-05-27) with Texas-New Mexico Power; no construction or financing announcements found.
Financing
Not recorded

Milestones in this assessment

IA executedMay 27, 2025Latest in this assessment

ERCOT Standard Generation Interconnection Agreement between Gamay Energy Storage LLC and Texas-New Mexico Power filed in PUC docket 35077; execution date per LBNL snapshot.

interchange.puc.texas.gov
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  2. interconnection.fyi/project/ercot-26inr0417
  3. geoforge.ai/report/power
  4. ercotqueue.com/developer/gamay-energy-storage-llc

Commercial operation date: Only the LBNL/ERCOT queue record gives a COD (2028-01-01), and the Geoforge aggregator repeats it. No press release or news article independently confirms or contradicts the date.

Developer: Only the project-named LLC appears as developer in the queue filing and in aggregator listings. No search result names a parent or operating company. The PUC docket shows an interconnection agreement with Texas-New Mexico Power but no sponsor.

Status: LBNL lists status active with IA Executed dated 2025-05-27. The PUC Interchange docket 35077 lists an ERCOT Standard Generation Interconnection Agreement between GAMAY ENERGY STORAGE LLC and TNMP, which is consistent with that status.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Gamay Energy Storage project is a proposed 418.6 MW battery storage project located in Brazoria County, Texas. The developer is Gamay Energy Storage LLC. This project is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0417, with a queue entry date of February 7, 2024.

The proposed commercial operation date is March 1, 2027. The project's interconnection agreement status is currently in the Facility Study phase. The point of interconnection is the tap of a 138 kV line. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

GAMAY ENERGY STORAGE LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138 kV Line from TNFM524 (39703) to West Columbia Main (39500), in Brazoria County.

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.