Buffalo Creek BESS (ERCOT-26INR0405) — Project Summary

Queue ID
ERCOT-26INR0405
Capacity
251.4 MW
Technology
Battery
Status
active
Location
Fort Bend, TX
Region
ERCOT
Developer
Old 300 Storage Center, LLC
IA Status
IA Executed

Buffalo Creek BESS

ERCOT-26INR0405BetaActiveBatteryERCOTLBNL

251.4 MW storage in Fort Bend, TX · In queue since March 2024 · Proposed COD March 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

251.4 MW

Capacity

1

Components

Battery

2y 8m

In Queue

IA Executed

IA Phase

Signed Oct 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

7 months

IA → COD

1y 5m

Total Duration

7 months

Schedule

9 months past proposed COD

Construction75%
Queue EntryMar 22, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 2, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2026-03-10

Queue history
26INR0405 · 28 monthly ERCOT reports, Mar 2024 – Jun 2026

Projected COD moved

1 time

Jun 2026 → Mar 2026

Net change

-3 months

first report to latest

Capacity

257 → 251 MW

changed in the reports

Latest stage

Commercial operation

last listed Jun 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 22, 2024
Facilities study approvedMar 18, 2025
Interconnection agreement signedOct 2, 2024
Approved for energizationDec 22, 2025
Approved for synchronizationFeb 13, 2026
Approved for commercial operationJul 31, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Mar 2026
From queue filing
Developer in saved assessment
Ørsted
Filed as Old 300 Storage Center, LLC
Status at research time
IA Executed
IA Executed — interconnection agreement signed with CenterPoint Energy Houston Electric on 2024-10-02, project remains active in queue
Financing
Not recorded

Milestones in this assessment

IA executedOct 2, 2024

Interconnection agreement executed with CenterPoint Energy Houston Electric

interchange.puc.texas.gov
COD targetMar 2026Latest in this assessment

Target commercial operation date per ERCOT capacity planning documents

ercot.com
Research sources and reasoning (3 recorded sources)

medium confidence at research time

  1. interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=35077&FilingParty=centerpoint&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  2. ercot.com/files/docs/2025/11/06/Capacity-Changes-by-Fuel-Type-Charts_October_2025_PlannedMonthly.xlsx
  3. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx

Commercial operation date: LBNL queue shows proposed COD of 2026-03-10, confirmed by ERCOT's October 2025 capacity chart listing '2026' target. No contradicting news sources found.

Developer: LBNL filing entity is 'Old 300 Storage Center, LLC' (project SPV). May 2024 ERCOT buildout report lists parent as 'Orsted Onshore North America LLC', indicating this is an Ørsted-developed project using a shell LLC for interconnection.

Status: LBNL shows IA executed 2024-10-02. Texas PUC filings confirm 'ERCOT Standard Generation Interconnection Agreement Between CenterPoint Energy Houston Electric, LLC, and Old 300 Storage Center, LLC' for Buffalo Creek BESS.

About

Saved background

Generated Apr 10, 2026 · Predates Jun 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Buffalo Creek BESS is a proposed 251.4 MW battery storage project in Fort Bend County, Texas. Developed by Old 300 Storage Center, LLC, the project consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0405, with a queue entry date of March 22, 2024, and a proposed commercial operation date of March 10, 2026.

The project's Interconnection Agreement (IA) has been executed as of October 2, 2024. The point of interconnection is the 44090 Cedar Creek 345kV location. The Buffalo Creek BESS project has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Jun 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Fort Bend

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Old 300 Storage Center, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

44090 Cedar Creek 345kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
MEDIUM
Nearest Node (Estimated)
BCK_RN
POI Substation
Cedar Creek Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.