BLACK BEAR SOLAR (ERCOT-26INR0365) — Project Summary

Queue ID
ERCOT-26INR0365
Capacity
102.9 MW
Technology
Solar
Status
active
Location
Crockett, TX
Region
ERCOT
Developer
ESCONDIDO DRAW RESOURCES, LLC
IA Status
Facility Study

BLACK BEAR SOLAR

ERCOT-26INR0365BetaActiveSolarERCOTLBNL + Live

102.9 MW generation in Crockett, TX · In queue since December 2023 · Proposed COD June 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

102.9 MW

Capacity

1

Components

Solar

2y 5m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

4y 6m

Facilities Study50%
Queue EntryDec 4, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-06-01

Risk Analytics

Forward-looking exposure analytics for this queue project — climate hazards, expected generation variability, counterparty risk — into a single decision-grade view. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability
Counterparty exposure
About

The Black Bear Solar project is a proposed 102.9 MW solar generation facility in Crockett County, Texas. The project, being developed by Escondido Draw Resources, LLC, is located within the ERCOT region and interconnected to point of interconnection #6564 ILLN4A 138 KV. It entered the ERCOT interconnection queue as project ERCOT-26INR0365 on December 4, 2023, with a proposed commercial operation date of June 1, 2028. Its interconnection status is currently in the Facility Study phase.

The development has been the subject of recent news coverage, with three articles focusing on industry trends and project development.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Crockett

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

ESCONDIDO DRAW RESOURCES, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

#6564 ILLN4A 138 KV

Data Source

LBNL + Live

Generation Forecast

Forward-looking generation outlook for this queue project with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year horizon (through 2034)
P10 / P50 / P90 confidence bands
Weather + policy + demand scenarios
Financial Forecast

Forward revenue, DSCR bands, and refinancing risk for this queue project, projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year cashflow horizon
P10 / P50 / P90 DSCR bands
Price + demand + policy scenarios
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No Ask reports yet for this entity.

Ask about BLACK BEAR SOLAR
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.