BLACK BEAR SOLAR (ERCOT-26INR0365) — Project Summary

Queue ID
ERCOT-26INR0365
Capacity
102.9 MW
Technology
Solar+Battery
Status
active
Location
Crockett, TX
Region
ERCOT
Developer
ESCONDIDO DRAW RESOURCES, LLC
IA Status
Facility Study

BLACK BEAR SOLAR

ERCOT-26INR0365BetaActiveSolarBatteryERCOTLBNL + Live

102.9 MW hybrid in Crockett, TX · In queue since December 2023 · Proposed COD June 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

102.9 MW

Capacity

1

Components

Solar

2y 11m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 6m

Facilities Study50%
Queue EntryDec 4, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-06-01

Queue history
26INR0365 · 28 monthly ERCOT reports, Jun 2024 – Sep 2026

Projected COD moved

2 times

Oct 2026 → Jun 2028

Net change

+20 months

first report to latest

Capacity

104 → 103 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 4, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 4y 7m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneCOD achieved · 2021-10Power Technology · 2022-04-26

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Jun 1, 2028
From queue filing
Developer in saved assessment
Escondido Draw Resources, LLC
From queue filing
Status at research time
Active
Active — Facility Study stage in ERCOT queue, no construction or financing announcements found
Financing
Not recorded

Milestones in this assessment

IA executedDec 2023Latest in this assessment

Project entered ERCOT queue in Facility Study stage

cleanview.co
Research sources and reasoning (2 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/solar-farms/texas/26INR0365/black-bear-solar
  2. westandswoperanches.com/listing/black-bear-ranch/985-county-road-414-sheffield-tx-79781/

Commercial operation date: Only LBNL queue data provides a COD target of June 2028. No news or press releases found for this specific Texas project to validate or contradict this date.

Developer: LBNL lists 'ESCONDIDO DRAW RESOURCES, LLC' as developer. No news coverage found for this entity or this specific Crockett County, TX project to identify a parent company. Search results returned unrelated 'Black Bear Solar' projects in Alabama and Virginia by different developers (Lightsource bp, Dominion Energy).

Status: LBNL status is 'active' at Facility Study stage. No public announcements or news coverage found to indicate progression beyond interconnection studies.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Black Bear Solar project is a proposed 102.9 MW solar generation facility in Crockett County, Texas. The project, being developed by Escondido Draw Resources, LLC, is located within the ERCOT region and interconnected to point of interconnection #6564 ILLN4A 138 KV. It entered the ERCOT interconnection queue as project ERCOT-26INR0365 on December 4, 2023, with a proposed commercial operation date of June 1, 2028. Its interconnection status is currently in the Facility Study phase.

The development has been the subject of recent news coverage, with three articles focusing on industry trends and project development.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Crockett

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

ESCONDIDO DRAW RESOURCES, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

#6564 ILLN4A 138 KV

Data Source

LBNL + Live

DeveloperLightsource bpPower Technology · 2022-04-26
EPC contractorMcCarthy Building CompaniesPower Technology · 2022-04-26
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles

No Ask reports yet for this entity.

Ask about BLACK BEAR SOLAR
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.