Midfield PV Project SLF (ERCOT-26INR0347) — Project Summary

Queue ID
ERCOT-26INR0347
Capacity
150 MW
Technology
Solar+Battery
Status
active
Location
Matagorda, TX
Region
ERCOT
Developer
HQC Solar Holdings 1, LLC
IA Status
Facility Study

Midfield PV Project SLF

ERCOT-26INR0347BetaActiveSolarBatteryERCOTLBNL + Live

150 MW hybrid in Matagorda, TX · In queue since December 2023 · Proposed COD July 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

150 MW

Capacity

1

Components

Solar

2y 11m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 7m

Facilities Study50%
Queue EntryDec 4, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-07-01

Queue history
26INR0347 · 35 monthly ERCOT reports, Nov 2023 – Sep 2026

Projected COD moved

2 times

Dec 2026 → Jul 2028

Net change

+19 months

first report to latest

Capacity

150 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 4, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Jun 2028
Differs from queue: Jul 1, 2028From queue filing
Developer in saved assessment
Hanwha Group
Filed as HQC Solar Holdings 1, LLC
Status at research time
Active
Active — Facility Study stage, no interconnection agreement yet, 5% build probability per ERCOT queue analytics
Financing
Not recorded

Milestones in this assessment

COD targetJun 2028Latest in this assessment

Proposed completion date updated from November 2027 to June 2028

interconnectionfyi.substack.com
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. cleanview.co/power-projects/developers/hanwha-group
  2. interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-602
  3. ercotqueue.com/project/26INR0347
  4. ercotqueue.com/developer/hqc-solar-holdings-1-llc

Commercial operation date: LBNL proposed COD is 2028-07-01. Interconnection.fyi newsletter (March 2025) reports proposed completion changed from November 2027 to June 2028, confirming a ~6-month shift but still aligning with LBNL's 2028 target year.

Developer: LBNL filing entity is 'HQC Solar Holdings 1, LLC' (project-specific LLC). Cleanview's developer pipeline page lists this project under 'Hanwha Group's Projects and Development Pipeline,' indicating Hanwha is the parent/operating company behind the HQC Solar Holdings shell entity.

Status: LBNL status is 'active' at Facility Study stage with no IA executed. Multiple queue-tracking sources (ercotqueue.com, interconnection.fyi) confirm active status as of April 2026 with low build-chance (5%) due to early interconnection stage.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Midfield PV Project SLF is a proposed 150 MW solar generation project located in Matagorda County, Texas. The project, developed by HQC Solar Holdings 1, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0347, with a queue entry date of December 4, 2023. The proposed commercial operation date is July 1, 2028.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 138kV 8121 Blessing - 8125 Lolita. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Matagorda

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

HQC Solar Holdings 1, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV 8121 Blessing - 8125 Lolita

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
MEDIUM
POI Substation
Blessing Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.