NET Power Demonstration plant (ERCOT-26INR0345) — Project Summary

Queue ID
ERCOT-26INR0345
Capacity
25.5 MW
Technology
Gas
Status
active
Location
Harris, TX
Region
ERCOT
Developer
NET Power LLC
IA Status
Facility Study

NET Power Demonstration plant

ERCOT-26INR0345BetaActiveGasERCOTLBNL + Live

25.5 MW generation in Harris, TX · In queue since December 2023 · Proposed COD August 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

25.5 MW

Capacity

1

Components

Gas

2y 7m

In Queue

Facility Study

IA Phase

COD target: 2027

Interconnection

Total Duration

3y 8m

Facilities Study50%
Queue EntryDec 20, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-08-21

About

The NET Power Demonstration plant is a proposed 25.5 MW gas-fired generation project located in Harris County, Texas. Developed by NET Power LLC, the project is interconnected within the Electric Reliability Council of Texas (ERCOT) region under queue ID ERCOT-26INR0345. The project entered the interconnection queue on December 20, 2023, and has a proposed commercial operation date of August 21, 2027. Its interconnection status is currently in the Facility Study phase.

The proposed project is linked to the existing NET Power La Porte Station operating plant (EIA ID 60910). Recent news coverage has discussed the development project.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Harris

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

NET Power LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

42360 Mirage POI 8 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
HIGH
Nearest Node (Estimated)
MIRAGE_G1
POI Substation
Mirage Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.