RUSH ESS
201.27 MW storage in Bexar, TX · In queue since November 2023 · Proposed COD February 2031
201.27 MW
Capacity
1
Components
Battery
3 years
In Queue
Facility Study
IA Phase
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 3m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-02-08
Projected COD moved
3 times
Jul 2026 → Feb 2031
Net change
+55 months
first report to latest
Capacity
203 → 201 MW
changed in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Queue entry filed with ERCOT, Facility Study stage
eia.govResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- power-technology.com/news/oci-energy-cps-energy/
- interconnection.fyi/eia/projects/type/battery
- renewablesinfo.org/plant/68361
- eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05
Commercial operation date: LBNL queue filing shows 2027-07-01 COD. EIA Electric Power Monthly confirms same 2027-07 target. No contradicting news sources found.
Developer: LBNL filing uses 'OCI Solar Power LLC' while Power Technology Dec 2024 article refers to parent 'OCI Energy' in partnership with CPS Energy for a separate 120MW BESS project. EIA and renewablesinfo.org list operating entity as 'Rush ESS LLC', indicating project-specific shell.
Status: LBNL shows 'active' status in Facility Study phase. No news coverage of groundbreaking, financing, or construction milestones for this specific project found.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The RUSH ESS project is a proposed 202.7 MW battery storage project located in Bexar County, Texas. Developed by OCI Solar Power LLC, it is interconnected within the ERCOT region under queue ID ERCOT-26INR0331. The project entered the queue on November 30, 2023, and has a proposed commercial operation date of July 1, 2027. Its interconnection status is currently in the Facility Study phase.
The proposed project is linked to the existing Rush ESS operating plant (EIA ID 68361). Recent news coverage indicates interest in the project related to grid infrastructure.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Bexar
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
OCI Solar Power LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345 kV 5231 HOWARD_5 – 5400 SPRUCE
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- CALAVER_JKS2
- POI Substation
- J. K. Spruce Switchyard
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
OCI Cobb Creek Solar
Data-driven briefing on OCI Solar Power — fleet, generation, financial, and news signals.
OCI SunRoper
Data-driven briefing on OCI Solar Power — fleet, generation, financial, and news signals.
OCI Alamo 3 LLC
Data-driven briefing on OCI Solar Power — fleet, generation, financial, and news signals.
OCI Alamo Solar I Hybrid
Data-driven briefing on OCI Solar Power — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.