Misty Hollow BESS (ERCOT-26INR0324) — Project Summary

Queue ID
ERCOT-26INR0324
Capacity
245.8 MW
Technology
Battery
Status
active
Location
Grimes, TX
Region
ERCOT
Developer
Clear Fork BESS, LLC
IA Status
IA Executed

Misty Hollow BESS

ERCOT-26INR0324BetaActiveBatteryERCOTLBNL + Live

245.8 MW storage in Grimes, TX · In queue since December 2023 · Proposed COD July 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

245.8 MW

Capacity

1

Components

Battery

2y 11m

In Queue

IA Executed

IA Phase

Signed Dec 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2 years

IA → COD

2y 7m

Total Duration

2 years

Construction75%
Queue EntryDec 20, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementDec 4, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-07-15

Queue history
26INR0324 · 34 monthly ERCOT reports, Dec 2023 – Sep 2026

Projected COD moved

1 time

Dec 2026 → Jul 2028

Net change

+19 months

first report to latest

Capacity

205 → 246 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 20, 2023
Facilities study approvedMar 4, 2025
Interconnection agreement signedDec 4, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Jul 15, 2028
From queue filing
Developer in saved assessment
Clear Fork BESS, LLC
From queue filing
Status at research time
IA Executed
IA Executed — interconnection agreement signed December 2025, project active in queue with 2028 target
Financing
Not recorded

Milestones in this assessment

IA executedDec 4, 2025

Interconnection agreement executed with CenterPoint Energy Houston Electric

interchange.puc.texas.gov
COD targetJul 14, 2028Latest in this assessment

Proposed completion date revised from November 2026 to July 2028

interconnectionfyi.substack.com
Research sources and reasoning (3 recorded sources)

medium confidence at research time

  1. interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-602
  2. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  3. ercot.com/files/docs/2026/01/08/Capacity-Changes-by-Fuel-Type-Charts_December_2025.xlsx

Commercial operation date: LBNL queue shows July 2028 COD. Interconnection.fyi confirms the project's proposed completion changed from Nov 2026 to July 14, 2028, corroborating the LBNL date. No developer announcements found to contradict this timeline.

Developer: All sources consistently identify Clear Fork BESS, LLC as the developer. No parent company or operating entity identified in search results. This appears to be the actual developer rather than a shell LLC, as no alternative corporate structure was found.

Status: LBNL shows IA executed on 2025-12-04. Texas PUC filings from December 2025 confirm interconnection agreement filings between CenterPoint Energy Houston Electric and Clear Fork BESS for Misty Hollow BESS, validating the IA execution status.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Misty Hollow BESS project is a proposed 245.8 MW battery storage project located in Grimes County, Texas. Developed by Clear Fork BESS, LLC, the project entered the ERCOT interconnection queue as entry ERCOT-26INR0324 on December 20, 2023. The current interconnection status is Facility Study, and the proposed commercial operation date is July 15, 2028.

The project consists entirely of battery storage, with a total capacity of 245.8 MW. The point of interconnection is the 345 kV Singleton substation (#44645). The project is currently listed as active within the ERCOT queue.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Grimes

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Clear Fork BESS, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

345 kV Singleton (#44645)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.