Edens Solar (ERCOT-26INR0313) — Project Summary

Queue ID
ERCOT-26INR0313
Capacity
70.37 MW
Technology
Solar
Status
active
Location
Hill, TX
Region
ERCOT
Developer
Hill PV, LLC
IA Status
Facility Study

Edens Solar

ERCOT-26INR0313BetaActiveSolarERCOTLBNL + Live

70.37 MW generation in Hill, TX · In queue since October 2023 · Proposed COD April 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

70.37 MW

Capacity

1

Components

Solar

2y 10m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Status
as of 6y 9m ago
Latest milestonegroundbreaking · 2019-11-19San Angelo Standard Times · 2019-11-19
Expected COD2020-10San Angelo Standard Times · 2019-11-19
Interconnection

Total Duration

4y 6m

Facilities Study50%
Queue EntryOct 25, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-09

Project lifecycle
as of 2019-11-19
PhaseConstructionSan Angelo Standard Times · 2019-11-19
OperationalNoSan Angelo Standard Times · 2019-11-19
TechnologyWindSan Angelo Standard Times · 2019-11-19
DeveloperAlgonquin Power and Utilities Corp.San Angelo Standard Times · 2019-11-19
GroundbreakingAnnouncedSan Angelo Standard Times · 2019-11-19
About

Edens Solar is a proposed 70.37 MW solar generation project located in Hill County, Texas. The developer is Hill PV, LLC. The project is interconnected within the ERCOT region under queue ID ERCOT-26INR0313, with an interconnection queue entry date of October 25, 2023, and a proposed commercial operation date of April 9, 2028. Its interconnection agreement status is currently in the Facility Study phase.

The proposed project is linked to the existing Edens Solar operating plant (EIA plant ID 67560). The project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Hill

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Hill PV, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 69kV 3532 Itasca - 3523 Hillsboro

Data Source

LBNL + Live

DeveloperAlgonquin Power and Utilities Corp.San Angelo Standard Times · 2019-11-19
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW
POI Substation
Hillsboro Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles

No Ask reports yet for this entity.

Ask about Edens Solar
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.