Senator Aggreko Storage (ERCOT-26INR0312) — Project Summary

Queue ID
ERCOT-26INR0312
Capacity
153.1 MW
Technology
Solar+Battery
Status
active
Location
Maverick, TX
Region
ERCOT
Developer
Senator Aggreko Storage LLC
IA Status
Facility Study

Senator Aggreko Storage

ERCOT-26INR0312BetaActiveBatteryBatteryERCOTLBNL + Live

153.1 MW generation in Maverick, TX · In queue since November 2023 · Proposed COD March 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

153.1 MW

Capacity

1

Components

Battery

3 years

In Queue

Facility Study

IA Phase

Signed Dec 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 1m

IA → COD

3y 3m

Total Duration

2y 1m

Construction50%
Queue EntryNov 14, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementDec 31, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2029-03-31

Queue history
26INR0312 · 35 monthly ERCOT reports, Nov 2023 – Sep 2026

Projected COD moved

1 time

Oct 2026 → Mar 2029

Net change

+29 months

first report to latest

Capacity

153 → 148 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedNov 14, 2023
Interconnection agreement signedDec 31, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Mar 31, 2029
From queue filing
Developer in saved assessment
Bimergen Energy Corporation
Ownership change in saved research
Status at research time
Active
Active — Facility Study stage per LBNL; acquired by Bimergen Energy in March 2026 as part of eight-project Texas BESS portfolio expansion
Financing
Not recorded
Ownership history
  1. 2026-03·Senator Aggreko Storage LLC (original developer)→Bimergen Energy Corporationquiverquant.com

Milestones in this assessment

IA executedJan 2026

ERCOT Standard Generation Interconnection Agreement filings with LCRA and Oncor for Senator Aggreko Storage LLC

interchange.puc.texas.gov
Ownership changeMar 2026

Bimergen Energy Corporation acquires eight late-stage battery storage projects in Texas including Senator Aggreko Storage

quiverquant.com
COD targetMar 31, 2029Latest in this assessment

ERCOT capacity chart lists Senator Aggreko Storage 153.1 MW battery with 2029 target COD

ercot.com
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. quiverquant.com/news/Bimergen+Energy+Corporation+Acquires+Eight+Late-Stage+Battery+Energy+Storage+Projects+in+Texas+to+Expand+Development+Pipeline
  2. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  3. ercot.com/files/docs/2026/02/05/Capacity-Changes-by-Fuel-Type-Charts_January_2026.xlsx
  4. cleanview.co/planned-battery-projects/TX/26INR0312/senator-aggreko-storage

Commercial operation date: LBNL queue snapshot shows proposed COD of 2029-03-31. ERCOT capacity chart from Feb 2026 confirms '2029' target. No press releases or developer announcements found to validate or update this date.

Developer: LBNL filing entity is 'Senator Aggreko Storage LLC' (project shell). Quiver Quantitative (Mar 3, 2026) reports 'Bimergen Energy Corporation Acquires Eight Late-Stage Battery Energy Storage Projects in Texas' — this project matches the profile (late-stage ERCOT BESS in TX). Bimergen is the current operating owner.

Status: LBNL status is 'active' with IA status 'Facility Study' (IA date 2025-12-31). PUC filings from Jan 2026 show active interconnection agreement processing with LCRA and Oncor. Acquisition by Bimergen suggests continued development intent.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Senator Aggreko Storage project is a proposed 153.1 MW battery storage project located in Maverick County, Texas. The project, developed by Senator Aggreko Storage LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0312, with a queue entry date of November 14, 2023. The proposed commercial operation date is March 31, 2029.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the 138 kV Rosita Creek Substation (#78015).

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Maverick

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Senator Aggreko Storage LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

138 kV Sunglow Substation (#78016)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Substation 41

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Senator Aggreko Storage
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.