Senator Aggreko Storage
153.1 MW generation in Maverick, TX · In queue since November 2023 · Proposed COD March 2029
153.1 MW
Capacity
1
Components
Battery
3 years
In Queue
Facility Study
IA Phase
Signed Dec 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 1m
IA → COD
3y 3m
Total Duration
2y 1m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Started, IA
Project under construction
Typical: 18–30 months
Proposed COD: 2029-03-31
Projected COD moved
1 time
Oct 2026 → Mar 2029
Net change
+29 months
first report to latest
Capacity
153 → 148 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
- 2026-03·Senator Aggreko Storage LLC (original developer)→Bimergen Energy Corporationquiverquant.com
Milestones in this assessment
ERCOT Standard Generation Interconnection Agreement filings with LCRA and Oncor for Senator Aggreko Storage LLC
interchange.puc.texas.govBimergen Energy Corporation acquires eight late-stage battery storage projects in Texas including Senator Aggreko Storage
quiverquant.comERCOT capacity chart lists Senator Aggreko Storage 153.1 MW battery with 2029 target COD
ercot.comResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- quiverquant.com/news/Bimergen+Energy+Corporation+Acquires+Eight+Late-Stage+Battery+Energy+Storage+Projects+in+Texas+to+Expand+Development+Pipeline
- interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
- ercot.com/files/docs/2026/02/05/Capacity-Changes-by-Fuel-Type-Charts_January_2026.xlsx
- cleanview.co/planned-battery-projects/TX/26INR0312/senator-aggreko-storage
Commercial operation date: LBNL queue snapshot shows proposed COD of 2029-03-31. ERCOT capacity chart from Feb 2026 confirms '2029' target. No press releases or developer announcements found to validate or update this date.
Developer: LBNL filing entity is 'Senator Aggreko Storage LLC' (project shell). Quiver Quantitative (Mar 3, 2026) reports 'Bimergen Energy Corporation Acquires Eight Late-Stage Battery Energy Storage Projects in Texas' — this project matches the profile (late-stage ERCOT BESS in TX). Bimergen is the current operating owner.
Status: LBNL status is 'active' with IA status 'Facility Study' (IA date 2025-12-31). PUC filings from Jan 2026 show active interconnection agreement processing with LCRA and Oncor. Acquisition by Bimergen suggests continued development intent.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Senator Aggreko Storage project is a proposed 153.1 MW battery storage project located in Maverick County, Texas. The project, developed by Senator Aggreko Storage LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0312, with a queue entry date of November 14, 2023. The proposed commercial operation date is March 31, 2029.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the 138 kV Rosita Creek Substation (#78015).
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Maverick
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Senator Aggreko Storage LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
138 kV Sunglow Substation (#78016)
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- POI Substation
- Substation 41
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Senator Aggreko StorageForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.