Nautilus Heavy Storage (ERCOT-26INR0306) — Project Summary

Queue ID
ERCOT-26INR0306
Capacity
256.24 MW
Technology
Battery
Status
active
Location
San Patricio, TX
Region
ERCOT
Developer
Nautilus Heavy Storage, LLC
IA Status
Facility Study

Nautilus Heavy Storage

ERCOT-26INR0306BetaActiveBatteryERCOTLBNL + Live

256.24 MW storage in San Patricio, TX · In queue since December 2023 · Proposed COD January 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

256.24 MW

Capacity

1

Components

Battery

2y 11m

In Queue

Facility Study

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 1m

Facilities Study50%
Queue EntryDec 20, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-01-30

Queue history
26INR0306 · 34 monthly ERCOT reports, Dec 2023 – Sep 2026

Projected COD moved

3 times

May 2026 → Jan 2030

Net change

+44 months

first report to latest

Capacity

512 → 256 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 20, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Jan 30, 2030
From queue filing
Developer in saved assessment
Nautilus Heavy Storage, LLC
From queue filing
Status at research time
Active
Active — Facility Study stage, no construction or financing announcements
Financing
Not recorded

Milestones in this assessment

IA executedDec 20, 2023Latest in this assessment

Queue entry date; Facility Study stage

interconnection.fyi
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-26inr0306
  2. interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-7d3
  3. ercotqueue.com/project/26INR0306

Commercial operation date: LBNL queue shows proposed COD of 2030-01-30. One search result (interconnectionfyi Substack, Jan 2025) mentions a COD change from May 2026 to December 2029, but no authoritative press release or developer announcement confirms a revised target. Defaulting to LBNL filing date.

Developer: LBNL filing entity is 'Nautilus Heavy Storage, LLC'. No press releases, corporate announcements, or ownership disclosures found. Search results reference 'Nautilus Solar Energy' (a separate community solar company), not this storage project. No evidence of a parent company or shell-LLC structure.

Status: LBNL status is 'active' with IA status 'Facility Study'. No news coverage of groundbreaking, financing, or permitting. Project remains in early interconnection-study phase.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Nautilus Heavy Storage project is a proposed 256.24 MW battery storage project located in San Patricio County, Texas. Developed by Nautilus Heavy Storage, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0306, with a queue entry date of December 20, 2023. The proposed commercial operation date is January 30, 2030, and the project's interconnection agreement status is currently in the Facility Study phase.

The project consists entirely of battery storage, with a total capacity of 256.24 MW. The point of interconnection is the 8422 Dupont 138kV location. The Nautilus Heavy Storage project has appeared in recent news coverage regarding energy storage developments in Texas.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

San Patricio

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Nautilus Heavy Storage, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

8422 Dupont 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
LGE_CC1
POI Substation
Dupont Switching Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.