Bhalu Storage (ERCOT-26INR0301) — Project Summary

Queue ID
ERCOT-26INR0301
Capacity
205.5 MW
Technology
Battery
Status
active
Location
Howard, TX
Region
ERCOT
Developer
Bhalu Storage, LLC
IA Status
Facility Study

Bhalu Storage

ERCOT-26INR0301BetaActiveBatteryERCOTLBNL + Live

205.5 MW storage in Howard, TX · In queue since October 2023 · Proposed COD April 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

205.5 MW

Capacity

1

Components

Battery

3y 1m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 6m

Facilities Study50%
Queue EntryOct 30, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-21

Queue history
26INR0301 · 36 monthly ERCOT reports, Oct 2023 – Sep 2026

Projected COD moved

5 times

Aug 2026 → Apr 2028

Net change

+20 months

first report to latest

Capacity

206 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 30, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
May 2028
Differs from queue: Apr 21, 2028
Developer in saved assessment
Bhalu Storage, LLC
From queue filing
Status at research time
Active
Active — Facility Study stage, environmental permitting underway (USACE wetlands delineation filed October 2024)
Financing
Not recorded

Milestones in this assessment

Permit approvedOct 28, 2024

USACE aquatic resources delineation report filed for Howard County site

swf.usace.army.mil
COD targetMay 5, 2028Latest in this assessment

Proposed completion date updated to May 5, 2028 (from March 2, 2027)

interconnectionfyi.substack.com
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/26INR0301/bhalu-storage
  2. interconnection.fyi/project/ercot-26inr0301
  3. interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-ad5
  4. swf.usace.army.mil/Portals/47/docs/regulatory/JDs/2024/SWF-2024-00496%20AJD.pdf?ver=ybHF10N_a_e-jXNt80h69A%3D%3D
  5. bizapedia.com/tx/bhalu-storage-llc.html

Commercial operation date: LBNL proposed COD was April 2028. Interconnection.fyi project update from April 2025 reports proposed completion changed from March 2027 to May 2028, indicating a recent schedule adjustment. Consensus is May 2028 based on most recent queue update.

Developer: All sources consistently identify 'Bhalu Storage, LLC' as the developer. No parent company or operating entity identified in search results. Texas LLC filing confirms entity organized September 2024, but no corporate parent disclosed.

Status: LBNL shows 'Active' status in Facility Study phase. USACE jurisdictional determination from October 2024 confirms active site preparation and environmental review, consistent with pre-construction development phase.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Bhalu Storage is a proposed 205.5 MW battery storage project located in Howard County, Texas. Developed by Bhalu Storage, LLC, the project consists entirely of battery storage. It is listed in the ERCOT interconnection queue as entry ERCOT-26INR0301, with a queue entry date of October 30, 2023, and a proposed commercial operation date of April 21, 2028. The project's interconnection status is currently in the Facility Study phase.

The proposed project is linked to the existing Bhalu operating plant (EIA ID 67652). The point of interconnection is Tap 138kV Bulldog (#23833) _x0013_ Elbow (#23834). The project has appeared in recent news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Howard

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Bhalu Storage, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV Bulldog (#23833) – Elbow (#23834)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
HIGH
POI Substation
Salem Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.