Momentum Hazy Jane BESS (ERCOT-26INR0273) — Project Summary

Queue ID
ERCOT-26INR0273
Capacity
125.5 MW
Technology
Battery
Status
active
Location
Ector, TX
Region
ERCOT
Developer
MOMENTUM HAZY JANE, LLC
IA Status
Facility Study

Momentum Hazy Jane BESS

ERCOT-26INR0273BetaActiveBatteryERCOTLBNL + Live

125.5 MW storage in Ector, TX · In queue since November 2023 · Proposed COD February 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

125.5 MW

Capacity

1

Components

Battery

3 years

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 3m

Facilities Study50%
Queue EntryNov 14, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-02-26

Queue history
26INR0273 · 20 monthly ERCOT reports, Feb 2025 – Sep 2026

Projected COD moved

1 time

Apr 2026 → Feb 2028

Net change

+22 months

first report to latest

Capacity

126 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedNov 14, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Feb 26, 2028
From queue filing
Developer in saved assessment
—
From queue filing
Status at research time
Active
Active — Facility Study phase, no interconnection agreement executed yet
Financing
Not recorded

Milestones in this assessment

IA executedLatest in this assessment

No interconnection agreement executed; currently in Facility Study phase

ercotqueue.com
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-26inr0273
  2. ercotqueue.com/project/26INR0273
  3. ercotqueue.com/developer/momentum-hazy-jane-llc

Commercial operation date: Only source available is LBNL queue snapshot showing proposed COD of February 26, 2028. No independent news or press releases found to validate or contradict this date.

Developer: Only entity identified is the LBNL filing LLC 'MOMENTUM HAZY JANE, LLC'. No press releases, corporate announcements, or news coverage found to identify the parent operating company behind this project vehicle.

Status: LBNL shows 'active' status with IA status at 'Facility Study' stage. Third-party queue trackers confirm active status with 'No IA' and note low build probability (5%), consistent with early-stage interconnection process.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Momentum Hazy Jane BESS is a proposed battery energy storage development project in Ector County, Texas. The project is being developed by Momentum Hazy Jane, LLC and has a planned capacity of 125.5 MW, consisting entirely of battery storage. It is designed to connect to the grid at a tap on the 138 kV line between the Judkins (1102) and Edward (1110) substations.

The project is listed in the Electric Reliability Council of Texas (ERCOT) interconnection queue under queue ID ERCOT-26INR0273. It entered the queue on November 14, 2023, and holds an active status. Its interconnection agreement process is at the Facility Study stage. The proposed commercial operation date is February 26, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Ector

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

MOMENTUM HAZY JANE, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV 1102 Judkins - 1110 Edward

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
JDKNS_RN
POI Substation
Judkins Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.