Camino Ranch Solar 2 SLF (ERCOT-26INR0256) — Project Summary

Queue ID
ERCOT-26INR0256
Capacity
237.21 MW
Technology
Solar+Battery
Status
active
Location
Houston, TX
Region
ERCOT
Developer
Camino Ranch Solar Project LLC
IA Status
Facility Study

Camino Ranch Solar 2 SLF

ERCOT-26INR0256BetaActiveSolarBatteryERCOTLBNL + Live

237.21 MW hybrid in Houston, TX · In queue since February 2024 · Proposed COD December 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

237.21 MW

Capacity

1

Components

Solar

2y 9m

In Queue

Facility Study

IA Phase

Signed Dec 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 10m

IA → COD

3 years

Total Duration

1y 10m

Construction50%
Queue EntryFeb 27, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementDec 31, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2028-12-09

Queue history
26INR0256 · 32 monthly ERCOT reports, Feb 2024 – Sep 2026

Projected COD moved

1 time

Oct 2027 → Dec 2028

Net change

+14 months

first report to latest

Capacity

237 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 27, 2024
Facilities study approvedMay 8, 2026
Interconnection agreement signedDec 31, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 9, 2028
From queue filing
Developer in saved assessment
Camino Ranch Solar Project LLC
From queue filing
Status at research time
Active
Active — Facility Study stage, IA pending completion by end of 2025
Financing
Not recorded

Milestones in this assessment

IA executedDec 31, 2025

Interconnection Agreement target completion date per LBNL queue data, confirmed in ERCOT capacity tracking

ercot.com
COD targetDec 9, 2028Latest in this assessment

Proposed commercial operation date for 237 MW solar+storage facility

cleanview.co
Research sources and reasoning (6 recorded sources)

low confidence at research time

  1. ercot.com/files/docs/2026/02/05/Capacity-Changes-by-Fuel-Type-Charts_January_2026.xlsx
  2. ercot.com/files/docs/2026/04/07/Capacity-Changes-by-Fuel-Type-Charts_March_2026.xlsx
  3. interchange.puc.texas.gov/Documents/35077_2392_1579507.PDF
  4. interconnection.fyi/projects/state/TX/houston-county
  5. cleanview.co/power-projects/planned/solar-farms/texas/26INR0256/camino-ranch-solar-2-slf
  6. ercotqueue.com/project/26INR0256

Commercial operation date: LBNL queue snapshot shows proposed COD of 2028-12-09. Multiple third-party aggregators (Cleanview, interconnection.fyi) confirm this December 2028 target, but no independent press releases or developer announcements found to validate or update this date.

Developer: Only source is LBNL filing entity 'Camino Ranch Solar Project LLC'. No press releases, corporate announcements, or news coverage found identifying a parent operating company. Entity name suggests project-specific LLC but no parent company identified in search results.

Status: LBNL shows 'active' status with Facility Study in progress and IA date of 2025-12-31. ERCOT capacity charts from Feb/Apr 2026 confirm project remains in queue with 2028 target. No withdrawal or construction announcements found.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Camino Ranch Solar 2 SLF project is a proposed 237.21 MW solar generation project located in Houston County, Texas. Developed by Camino Ranch Solar Project LLC, the project is in the ERCOT interconnection queue as entry ERCOT-26INR0256, with a queue entry date of February 27, 2024. The proposed commercial operation date is December 9, 2028, and the project's interconnection status is currently in the Facility Study phase.

The proposed project consists of 237.21 MW of solar capacity. Recent news coverage has discussed the Camino Ranch Solar 2 SLF project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Houston

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Camino Ranch Solar Project LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap to Jim English (#3351) – Flat Branch (#3345) 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.