Goldfinch Solar (ERCOT-26INR0253) — Project Summary

Queue ID
ERCOT-26INR0253
Capacity
150.77 MW
Technology
Solar+Battery
Status
active
Location
Van Zandt, TX
Region
ERCOT
Developer
BT DJ4M Solar, LLC
IA Status
Facility Study

Goldfinch Solar

ERCOT-26INR0253BetaActiveSolarBatteryERCOTLBNL + Live

150.77 MW hybrid in Van Zandt, TX · In queue since September 2023 · Proposed COD March 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

150.77 MW

Capacity

1

Components

Solar

3y 2m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 6m

Facilities Study50%
Queue EntrySep 22, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-03-31

Queue history
26INR0253 · 34 monthly ERCOT reports, Sep 2023 – Sep 2026

Projected COD moved

6 times

Sep 2026 → Mar 2029

Net change

+30 months

first report to latest

Capacity

151 → 151 MW

changed in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 22, 2023
Facilities study approvedFeb 20, 2025
On ERCOT's inactive listSep 2024 – Nov 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
2029
From queue filing
Developer in saved assessment
BT DJ4M Solar, LLC
From queue filing
Status at research time
Active
Active — Facility Study stage per LBNL; facing local opposition from Save Van Zandt County group as of mid-2025
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. savevzcounty.org/current-projects
  2. facebook.com/groups/savevzcounty/posts/1750277625576444/
  3. facebook.com/groups/savevzcounty/posts/1968115290459281/

Commercial operation date: LBNL queue filing shows 2029-03-31 proposed COD. No independent news sources confirm or update this date; local opposition group mentions project is 'hot topic' as of July 2025 but provides no timeline updates.

Developer: Only LBNL filing identifies developer as 'BT DJ4M Solar, LLC'. No press releases, corporate announcements, or news coverage reveal a parent company or operating entity. The entity name pattern suggests a project LLC but no parent is discoverable.

Status: LBNL shows 'active' status in Facility Study phase. Local opposition group 'Save Van Zandt County' actively tracking project as of July 2025, indicating it remains under development despite community resistance.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Goldfinch Solar is a proposed 150.54 MW solar generation project located in Van Zandt County, Texas. The project, developed by BT DJ4M Solar, LLC, is in the ERCOT interconnection queue as entry ERCOT-26INR0253, with a queue entry date of September 22, 2023. The proposed commercial operation date is March 31, 2029. Its interconnection status is currently in the Facility Study phase.

The Goldfinch Solar project has been featured in recent news coverage related to the energy industry. The point of interconnection is the Tap Connection Bus 2485 Poetry Switch _x0013_ 3223 Shamburger Switch.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Van Zandt

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

BT DJ4M Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap Connection Bus 2485 Poetry Switch – 3223 Shamburger Switch

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.