Neutron Storage
104.5 MW storage in Mclennan, TX · In queue since September 2023 · Proposed COD April 2028
104.5 MW
Capacity
1
Components
Battery
3y 2m
In Queue
IA Executed
IA Phase
Signed Dec 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 3m
IA → COD
2y 4m
Total Duration
2y 3m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Completed, IA
Project under construction
Typical: 6–18 months
Proposed COD: 2028-04-29
Projected COD moved
3 times
Mar 2026 → Apr 2028
Net change
+25 months
first report to latest
Capacity
100 → 105 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Standard Generation Interconnection Agreement executed between Oncor Electric Delivery and Elawan Neutron Storage LLC
interchange.puc.texas.govExpected commercial operation date for 104.5 MW battery storage facility in McLennan County
cleanview.coResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/texas/26INR0252/neutron-storage
- interconnection.fyi/project/ercot-26inr0252
- citizenportal.ai/articles/7771236/Texas/McLennan-County/County-defers-roaduse-agreement-for-battery-storage-site-after-safety-and-monitoring-questions
- interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
Commercial operation date: LBNL queue shows proposed COD of April 2028. No independent news sources found discussing this specific project's timeline, so LBNL remains the only authoritative source.
Developer: LBNL filing entity is 'Elawan Neutron Storage, LLC', a project-specific LLC. The parent company is Elawan Energy, a renewable energy developer. McLennan County road-use agreement filing confirms 'Elowin Neutron Storage LLC' (likely spelling variant).
Status: LBNL shows IA executed on 2025-12-05. Texas PUC Interchange confirms Standard Generation Interconnection Agreement filing between Oncor and Elawan Neutron Storage LLC on 12/31/2025, corroborating the IA execution.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Neutron Storage project is a proposed 104.36 MW battery energy storage system located in McLennan County, Texas. The project, developed by Neutron Storage, is interconnected within the ERCOT region and entered the ERCOT interconnection queue as ERCOT-26INR0252 on September 8, 2023. Its proposed commercial operation date is April 29, 2028, and its interconnection agreement status is currently in the Facility Study phase.
The proposed project consists entirely of battery storage, with a total capacity of 104.36 MW. The point of interconnection is the Tap 345kV 13405 Trading House - 68090 Sam Switch. The project is currently listed as active within the ERCOT interconnection queue.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Mclennan
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Elawan Neutron Storage, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 13405 Trading House - 68090 Sam Switch
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.