Cairos Storage (ERCOT-26INR0245) — Project Summary

Queue ID
ERCOT-26INR0245
Capacity
77.28 MW
Technology
Solar+Battery
Status
active
Location
Kinney, TX
Region
ERCOT
Developer
Cairos Solar, LLC
IA Status
Facility Study

Cairos Storage

ERCOT-26INR0245BetaActiveBatteryBatteryERCOTLBNL

77.28 MW generation in Kinney, TX · In queue since October 2023 · Proposed COD December 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

77.28 MW

Capacity

1

Components

Battery

3y 1m

In Queue

Facility Study

IA Phase

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 2m

Facilities Study50%
Queue EntryOct 25, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-12-31

Queue history
26INR0245 · 34 monthly ERCOT reports, Oct 2023 – Jul 2026

Projected COD moved

2 times

Mar 2026 → Dec 2028

Net change

+33 months

first report to latest

Capacity

77 MW

unchanged in the reports

Latest stage

Cancelled

last listed Jul 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 25, 2023
CancelledAug 24, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Apr 10, 2026 · Predates Jul 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Cairos Storage project is a proposed 77.28 MW battery energy storage system in Kinney County, Texas. Developed by Cairos Solar, LLC, the project entered the ERCOT interconnection queue as entry ERCOT-26INR0245 on October 25, 2023. The current proposed commercial operation date is December 31, 2026, and the project's interconnection agreement status is currently in the Facility Study phase.

The Cairos Storage project has been mentioned in recent industry news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Jul 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Kinney

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Cairos Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

7425 ODLAW SWITCH 138kV

Data Source

LBNL

TransactionPPAInside Climate News · 2025-06-03
OfftakerMetaInside Climate News · 2025-06-03
PPA structurePhysicalInside Climate News · 2025-06-03
PPA term20 yearsInside Climate News · 2025-06-03
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-04-09

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.