First Capitol BESS
257.48 MW storage in Brazoria, TX · In queue since October 2023 · Proposed COD November 2027
257.48 MW
Capacity
1
Components
Battery
3y 1m
In Queue
IA Executed
IA Phase
Signed May 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
1y 7m
IA → COD
2y 6m
Total Duration
1y 7m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Started, IA
Project under construction
Typical: 6–18 months
Proposed COD: 2027-11-01
Projected COD moved
5 times
May 2026 → Nov 2027
Net change
+18 months
first report to latest
Capacity
256 → 257 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Interconnection Agreement executed with ERCOT
interconnection.fyiResearch sources and reasoning (3 recorded sources)
low confidence at research time
- interconnection.fyi/project/ercot-26inr0226
- cleanview.co/power-projects/planned/battery-storage-projects/texas/26INR0226/first-capitol-bess
- ercot.com/files/docs/2025/03/07/CapacityChangesbyFuelTypeCharts_February_2025.xlsx
Commercial operation date: LBNL queue snapshot shows proposed COD of 2027-05-01. No news articles or press releases specifically mention First Capitol BESS or provide alternative COD dates. ERCOT spreadsheet from March 2025 shows 2026 target, but this is less authoritative than the official queue filing with IA executed.
Developer: Only source is LBNL filing entity 'First Capitol BESS, LLC'. No news coverage identifies a parent company or operating entity. The LLC name pattern suggests it may be a project SPV, but no research findings confirm an actual parent developer.
Status: LBNL shows 'active' status with IA executed on 2025-05-15. No news coverage confirms construction start or other milestones beyond interconnection agreement execution.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
First Capitol BESS is a proposed 256.2 MW battery storage project located in Brazoria County, Texas. The project, developed by First Capitol BESS, LLC, is interconnected within the ERCOT region and entered the ERCOT interconnection queue as project number ERCOT-26INR0226 on October 4, 2023. The current proposed commercial operation date is May 1, 2027.
The project's Interconnection Agreement (IA) has been executed as of June 10, 2024. The point of interconnection is Tap 138kV West Columbia Main (39500) - Sweeny Cogen (110505).
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Brazoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
First Capitol BESS, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV West Columbia Main (39500) - Sweeny Cogen (110505)
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- NCO_RN
- POI Substation
- West Columbia Main Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery storage pipeline in ERCOT
Data tables and metrics from the InfraSure database.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.