TRIFECTA Gas (ERCOT-26INR0183) — Project Summary

Queue ID
ERCOT-26INR0183
Capacity
453 MW
Technology
Gas
Status
active
Location
Midland, TX
Region
ERCOT
Developer
NET Power
IA Status
Facility Study

TRIFECTA Gas

ERCOT-26INR0183BetaActiveGasERCOTLBNL

453 MW generation in Midland, TX · In queue since June 2023 · Proposed COD February 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

453 MW

Capacity

1

Components

Gas

3y 5m

In Queue

Facility Study

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 8m

Facilities Study50%
Queue EntryJun 28, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-02-11

Queue history
26INR0183 · 25 monthly ERCOT reports, Mar 2024 – Mar 2026

Projected COD moved

2 times

Dec 2027 → Feb 2030

Net change

+26 months

first report to latest

Capacity

453 MW

unchanged in the reports

Latest stage

Cancelled

last listed Mar 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 28, 2023
Facilities study approvedMar 24, 2025
CancelledApr 20, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Feb 11, 2030
From queue filing
Developer in saved assessment
NET Power
From queue filing
Status at research time
Active
Active — ERCOT report (Jan 2026) shows system study and full interconnection study (FIS) completed, no interconnection agreement executed yet.
Financing
Not recorded
Research sources and reasoning (1 recorded sources)

low confidence at research time

  1. interchange.puc.texas.gov/Documents/59029_216_1579005.PDF

Commercial operation date: Only the LBNL date exists. A Jan 2026 PUC Texas Interchange filing (ERCOT generation report) lists 'TRIFECTA Gas ... NET Power - Midland - WEST - 02/11/2030', but it appears to come from the same ERCOT queue data, so it is not an independent confirmation. No news or press release gives a developer target date.

Developer: LBNL and the PUC Texas ERCOT report both name NET Power, but both derive from the same queue data. No press release or news confirms the developer, and no shell LLC or ownership change was found.

Status: LBNL lists the project as active at the Facility Study stage. The Jan 2026 PUC Texas Interchange listing shows SS and FIS completed with no IA, which is consistent with an active queue entry that has not yet reached IA execution.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The TRIFECTA Gas project is a proposed 453 MW gas-fired generation project located in Midland County, Texas. Developed by NET Power, the project consists of a single 453 MW gas component. It is listed in the ERCOT interconnection queue as entry ERCOT-26INR0183, with a queue entry date of June 28, 2023, and a proposed commercial operation date of February 11, 2030. The project's interconnection status is currently in the Facility Study phase.

The TRIFECTA Gas project has been the subject of recent news coverage, with 29 articles appearing in the press. These articles primarily focus on industry-related topics, with additional coverage on regulatory and grid-related aspects of the project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Mar 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Midland

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

NET Power

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV 1185 Midland County Northwest Switch (bus #1185) – Midland East (bus #1021) 345 kV Line Ckt 01

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Midland County Northwest Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.