Solar Star Frontier BESS
101.02 MW storage in Cameron, TX · In queue since June 2023 · Proposed COD February 2029
101.02 MW
Capacity
1
Components
Battery
3y 5m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 8m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-02-27
Projected COD moved
1 time
Dec 2025 → Feb 2029
Net change
+38 months
first report to latest
Capacity
100 → 101 MW
changed in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Project entered ERCOT interconnection queue as 26INR0181
cleanview.coResearch sources and reasoning (2 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/texas/26INR0181/solar-star-frontier-bess
- renewablesinfo.org/project/ercot-26inr0181-solar-star-frontier-bess
Commercial operation date: LBNL queue snapshot shows proposed COD of 2029-02-27. No news articles or press releases found discussing this specific project's timeline, so LBNL remains the only source.
Developer: LBNL filing entity is 'Solar Star Frontier BESS, LLC' which appears to be a project-specific LLC. No news coverage or corporate announcements found identifying the parent operating company or developer behind this entity.
Status: LBNL status shows 'active' with IA status at 'Facility Study' stage. No contradictory information found in search results; project appears to be progressing through standard interconnection process without public visibility.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Solar Star Frontier BESS project is a proposed 100.26 MW battery storage project located in Cameron County, Texas. The developer is Solar Star Frontier BESS, LLC. It is currently in the ERCOT interconnection queue as entry ERCOT-26INR0181, with a queue entry date of June 28, 2023. The proposed commercial operation date is February 27, 2029, and the project's interconnection agreement status is currently in the Facility Study phase.
The project consists of 100.26 MW of battery storage capacity. Recent news coverage has discussed the development project.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Cameron
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Solar Star Frontier BESS, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
8656 Luna 138kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.