Cape Rich BESS (ERCOT-26INR0180) — Project Summary

Queue ID
ERCOT-26INR0180
Capacity
150.52 MW
Technology
Battery
Status
active
Location
Navarro, TX
Region
ERCOT
Developer
Cape Rich BESS
IA Status
IA Executed

Cape Rich BESS

ERCOT-26INR0180BetaActiveBatteryERCOTLBNL + Live

150.52 MW storage in Navarro, TX · In queue since July 2023 · Proposed COD April 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

150.52 MW

Capacity

1

Components

Battery

3y 4m

In Queue

IA Executed

IA Phase

Signed Feb 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 7m

IA → COD

5y 2m

Total Duration

1y 7m

Construction75%
Queue EntryJul 10, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementFeb 3, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2030-04-18

Queue history
26INR0180 · 39 monthly ERCOT reports, Jul 2023 – Sep 2026

Projected COD moved

8 times

Apr 2026 → Apr 2030

Net change

+48 months

first report to latest

Capacity

151 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 10, 2023
Facilities study approvedJun 26, 2024
Interconnection agreement signedFeb 3, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Apr 17, 2028
Differs from queue: Apr 18, 2030From queue filing
Developer in saved assessment
—
From queue filing
Status at research time
IA Executed
IA Executed — interconnection agreement signed with Oncor on February 3, 2025, system studies completed per ERCOT records
Financing
Not recorded

Milestones in this assessment

IA executedFeb 3, 2025

Standard Generation Interconnection Agreement executed between Oncor Electric Delivery Company LLC and Cape Rich BESS LLC

interchange.puc.texas.gov
COD targetApr 17, 2028Latest in this assessment

Expected commercial operation date per LBNL queue filing

cleanview.co
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/26INR0180/cape-rich-bess
  2. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  3. interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-602
  4. ercot.com/files/docs/2025/03/07/CapacityChangesbyFuelTypeCharts_February_2025.xlsx
  5. cleanview.co/power-projects/developers/navitas-energy

Commercial operation date: LBNL queue snapshot shows April 2028 COD. ERCOT capacity chart (Feb 2025) lists 2027 target, but this appears to be a generic year placeholder. No developer press releases or financing announcements found to confirm actual target date.

Developer: LBNL filing entity is 'Cape Rich BESS LLC' (confirmed in PUC Interchange filings with Oncor). Cleanview lists 'Navitas Energy' as developer in their pipeline page, but this is the only mention and lacks corroboration from press releases or corporate announcements. Cannot confirm operating parent with confidence.

Status: LBNL shows IA executed 2025-02-03. PUC Interchange confirms Standard Generation Interconnection Agreement between Oncor and Cape Rich BESS LLC. Interconnection.fyi newsletter (March 2025) confirms IA date added February 2, 2025.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Cape Rich BESS project is a proposed 150.52 MW battery storage project located in Navarro County, Texas. The developer is listed as Cape Rich BESS. It is currently in the ERCOT interconnection queue as entry ERCOT-26INR0180, with a queue entry date of July 10, 2023. The project's proposed commercial operation date is April 17, 2028, and its interconnection agreement status is currently in the Facility Study phase.

The project consists of 150.52 MW of battery storage capacity. The point of interconnection is the 3387 Revolution Switch 138kV. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Navarro

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Cape Rich BESS

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

3387 Revolution Switch 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.