SunShiner ESS (ERCOT-26INR0179) — Project Summary

Queue ID
ERCOT-26INR0179
Capacity
200 MW
Technology
Battery
Status
active
Location
Zavala, TX
Region
ERCOT
Developer
SunShiner ESS LLC
IA Status
Facility Study

SunShiner ESS

ERCOT-26INR0179BetaActiveBatteryERCOTLBNL + Live

200 MW storage in Zavala, TX · In queue since September 2023 · Proposed COD May 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

200 MW

Capacity

1

Components

Battery

3y 2m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 8m

Facilities Study50%
Queue EntrySep 25, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-05-11

Queue history
26INR0179 · 37 monthly ERCOT reports, Sep 2023 – Sep 2026

Projected COD moved

2 times

Jul 2026 → May 2029

Net change

+34 months

first report to latest

Capacity

132 → 200 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 25, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Jul 2027
Differs from queue: May 11, 2029From queue filing
Developer in saved assessment
SunShiner ESS LLC
From queue filing
Status at research time
Active
Active — Facility Study stage per LBNL queue (Sept 2023 entry), no construction or financing announcements found
Financing
Not recorded

Milestones in this assessment

IA executedSep 2023Latest in this assessment

Entered ERCOT queue at Facility Study stage (26INR0179)

modo-content-service-prod.s3.amazonaws.com
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/26INR0179/sunshiner-ess
  2. renewablesinfo.org/plant/68363-sunshiner-ess
  3. eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05
  4. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx
  5. interconnection.fyi/project/ercot-26inr0179

Commercial operation date: LBNL queue snapshot shows proposed COD of July 2027. No independent news sources or press releases found to confirm or contradict this date; all search results are aggregator sites echoing the LBNL/EIA filing data.

Developer: Only entity identified across all sources is 'SunShiner ESS LLC' from LBNL filing and EIA records. No press releases, corporate announcements, or news coverage found to reveal a parent company or operating entity distinct from the filing LLC.

Status: LBNL status is 'active' with IA status at 'Facility Study'. ERCOT May 2024 buildout report confirms 'FIS' (Facility Interconnection Study) stage. No news of permitting, groundbreaking, or financing to indicate progression beyond study phase.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The SunShiner ESS project is a proposed 200 MW battery storage project located in Zavala County, Texas. Developed by SunShiner ESS LLC, the project entered the ERCOT interconnection queue as queue ID ERCOT-26INR0179 on September 25, 2023. Its proposed commercial operation date is July 1, 2027, and its interconnection status is currently in the Facility Study phase.

The proposed project is linked to the existing SunShiner ESS operating plant (EIA plant ID 68363).

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Zavala

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

SunShiner ESS LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

8672 LaPryor2A 138 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
POI Substation
La Pyor Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.