Juniper Ridge BESS 1 (ERCOT-26INR0173) — Project Summary

Queue ID
ERCOT-26INR0173
Capacity
251.5 MW
Technology
Battery
Status
active
Location
Hardeman, TX
Region
ERCOT
Developer
Lazy U ESS 1
IA Status
Facility Study

Juniper Ridge BESS 1

ERCOT-26INR0173BetaActiveBatteryERCOTLBNL + Live

251.5 MW storage in Hardeman, TX · In queue since September 2023 · Proposed COD June 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

251.5 MW

Capacity

1

Components

Battery

3y 2m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 9m

Facilities Study50%
Queue EntrySep 8, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-30

Queue history
26INR0173 · 38 monthly ERCOT reports, Aug 2023 – Sep 2026

Projected COD moved

2 times

Jul 2026 → Jun 2029

Net change

+35 months

first report to latest

Capacity

252 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 8, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Jun 30, 2029
From queue filing
Developer in saved assessment
OCI Holdings
Filed as Lazy U ESS 1
Status at research time
Active
Active — in Facility Study phase per ERCOT queue, no construction or financing announcements found
Financing
Not recorded
Ownership history
  1. 2025-06·Lazy U ESS 1 LLC→Juniper Ridge BESS 1 LLCkind.krx.co.kr

Milestones in this assessment

IA executedSep 2023Latest in this assessment

Entered ERCOT queue on September 8, 2023 as queue ID 26INR0173

interconnection.fyi
Research sources and reasoning (3 recorded sources)

medium confidence at research time

  1. interconnection.fyi/project/ercot-26inr0173
  2. kind.krx.co.kr/external/2026/03/18/000720/20260318003593/11011.htm
  3. comp.wisereport.co.kr/company/c1020001.aspx?cmp_cd=010060&cn=

Commercial operation date: Only LBNL queue data provides a COD target of June 30, 2029. No news or research sources discuss this specific Texas project's timeline or construction status.

Developer: Korean corporate filings (KRX disclosures) show 'Lazy U ESS 1 LLC' was renamed to 'Juniper Ridge BESS 1 LLC' in June 2025 and is a subsidiary of OCI Holdings, which operates multiple solar and BESS projects in Texas. The LBNL filing entity is a project LLC.

Status: LBNL status 'active' with IA status 'Facility Study' is consistent with early-stage development. No news coverage of this specific Hardeman County project exists; search results returned unrelated Snoqualmie, WA projects.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Lazy U ESS 1 is a proposed battery storage project located in Hardeman County, Texas, within the ERCOT region. The development project, with a total capacity of 251.5 MW, is being developed by Lazy U ESS 1. It consists entirely of battery storage.

The project is listed in the ERCOT interconnection queue as entry 26INR0173, with a queue entry date of September 8, 2023, and a proposed commercial operation date of June 30, 2029. Its interconnection agreement status is currently in the Facility Study phase. The project is linked to the existing Lazy U ESS 1 operating plant (EIA ID 68355).

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Hardeman

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Lazy U ESS 1

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap EDITHCLA7B [60505] -- TESLA7A [60501] 345kV ckt2

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.