Lazy U Solar 2 (ERCOT-26INR0172) — Project Summary

Queue ID
ERCOT-26INR0172
Capacity
252 MW
Technology
Solar
Status
active
Location
Hardeman, TX
Region
ERCOT
Developer
Lazy U Solar 2
IA Status
Facility Study

Lazy U Solar 2

ERCOT-26INR0172BetaActiveSolarERCOTLBNL + Live

252 MW generation in Hardeman, TX · In queue since August 2023 · Proposed COD June 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

252 MW

Capacity

1

Components

Solar

3y 3m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 10m

Facilities Study50%
Queue EntryAug 21, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-30

Queue history
26INR0172 · 38 monthly ERCOT reports, Aug 2023 – Sep 2026

Projected COD moved

2 times

Jul 2026 → Jun 2029

Net change

+35 months

first report to latest

Capacity

252 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 21, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Jun 30, 2029
From queue filing
Developer in saved assessment
Lazy U Solar 2 LLC
From queue filing
Status at research time
Active
Active — Facility Study phase, secured tax abatement from Hardeman County in November 2025
Financing
Not recorded

Milestones in this assessment

Permit approvedNov 2025Latest in this assessment

Hardeman County approved tax abatement for solar farm, expected to generate $3.2M for school district and $1.2M for hospital

texomashomepage.com
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. texomashomepage.com/news/local-news/hardeman-county-oks-solar-farm-tax-break-amid-protests/
  2. interconnection.fyi/eia/project/68358-lupv2
  3. interconnection.fyi/project/ercot-26inr0172
  4. cleanview.co/power-projects/planned/solar-farms/texas/68358_LUPV2/lazy-u-solar-2
  5. ercotqueue.com/project/26INR0172

Commercial operation date: LBNL queue snapshot shows proposed COD of 2029-06-30. No press releases, financing announcements, or developer statements found to contradict this date. Cleanview aggregator confirms 2029 expected online date.

Developer: LBNL filing entity is 'Lazy U Solar 2', which appears to be the actual project LLC rather than a shell for a larger parent company. No press releases or corporate announcements found identifying a different operating parent. EIA records confirm 'Lazy U Solar 2 LLC' as the developer entity.

Status: LBNL shows 'active' status in Facility Study phase. November 2025 news confirms the project secured a tax abatement from Hardeman County, indicating active local permitting progress despite community protests.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Lazy U Solar 2 is a proposed solar generation project located in Hardeman County, Texas, within the ERCOT region. The development project, with a total capacity of 252 MW, is being developed by Lazy U Solar 2. It consists of 252 MW of solar photovoltaic generation.

The project is listed in the ERCOT interconnection queue as entry ERCOT-26INR0172, with a queue entry date of August 21, 2023, and a proposed commercial operation date of June 30, 2029. Its interconnection agreement status is currently in the Facility Study phase. The project is linked to the existing Lazy U Solar 2 operating plant (EIA ID 68358).

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Hardeman

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Lazy U Solar 2

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 60505 EDITHCLA7B - 60501 TESLA7A CKT2

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW
POI Substation
Quanah Acme Mills Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.