DMF Sagerton Storage SLF
— hybrid in Haskell, TX · In queue since July 2023 · Proposed COD December 2028
—
Capacity
0
Components
3y 3m
In Queue
—
IA Status
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 5m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-15
DMF Sagerton Storage SLF (ERCOT queue ID 26INR0148) is a proposed battery energy storage development project in Haskell County, Texas, being developed by Double Mountain Fork LLC. The project is classified as a hybrid facility, with its technology components listed as battery energy storage and an additional component categorized as "Other." The available data does not specify a total capacity or the individual capacities of the components. The project is planned to connect to the grid through a tap on the 138 kV transmission line between the Aspermont (6158) and Paint Creek (6161) substations.
The project is in the interconnection queue of the Electric Reliability Council of Texas (ERCOT), which it entered on July 31, 2023. It holds an active status in the queue and has a proposed commercial operation date of December 15, 2028. The available data does not report the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Haskell
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Double Mountain Fork LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV 6158 Aspermont – 6161 Paint Creek
Data Source
Live · ERCOT
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- POI Substation
- Aspermont Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about DMF Sagerton Storage SLFForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.