Lemma Solar (ERCOT-26INR0112) — Project Summary

Queue ID
ERCOT-26INR0112
Capacity
100.61 MW
Technology
Solar
Status
active
Location
Knox, TX
Region
ERCOT
Developer
Greening USA Corp.
IA Status
Facility Study

Lemma Solar

ERCOT-26INR0112BetaActiveSolarERCOTLBNL + Live

100.61 MW generation in Knox, TX · In queue since April 2023 · Proposed COD July 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

100.61 MW

Capacity

1

Components

Solar

3y 7m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 3m

Facilities Study50%
Queue EntryApr 7, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-07-01

Queue history
26INR0112 · 41 monthly ERCOT reports, May 2023 – Sep 2026

Projected COD moved

1 time

Mar 2026 → Jul 2028

Net change

+28 months

first report to latest

Capacity

101 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 7, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Jun 2028
Differs from queue: Jul 1, 2028From queue filing
Developer in saved assessment
Greensol
Filed as Greening USA Corp.
Status at research time
Active
Active — Facility Study phase, no IA executed yet. Build probability assessed as low (5%) by queue trackers.
Financing
Not recorded

Milestones in this assessment

COD targetJun 2028Latest in this assessment

Expected commercial operation date June 2028

cleanview.co
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. cleanview.co/planned-solar-projects/TX/26INR0112/lemma-solar
  2. ercotqueue.com/project/26INR0112
  3. green-sol.us/
  4. ercotqueue.com/developer/greening-usa-corp
  5. interconnection.fyi/projects/state/TX/knox-county

Commercial operation date: LBNL queue snapshot shows proposed COD of 2028-07-01. Cleanview aggregator confirms 'expected to come online in June 2028' which aligns with LBNL. No contradictory signals found in research.

Developer: LBNL filing entity is 'Greening USA Corp.' but Greensol's corporate website (green-sol.us) lists 'LEMMA SOLAR' in Knox, Texas at 100.61 MW as one of their projects, indicating Greensol is the operating company behind the filing entity.

Status: LBNL shows 'active' status in Facility Study phase with no IA date. Multiple queue aggregators confirm active status with no IA, though ercotqueue.com notes only 5% build-chance probability.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Lemma Solar project is a proposed 100.61 MW solar generation facility in Knox County, Texas. Developed by Greening USA Corp., the project is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0112, with a queue entry date of April 7, 2023. The proposed commercial operation date is July 1, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The project consists of 100.61 MW of solar photovoltaic generation. The point of interconnection is the 6088 Benjamin AEP 138kV line. The Lemma Solar project has appeared in recent news coverage regarding renewable energy development in Texas.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Knox

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Greening USA Corp.

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

6088 Benjamin AEP 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Benjamin Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.