Pin Peaking Energy Center 2 (TEF- Due Diligence) (ERCOT-26INR0109) — Project Summary

Queue ID
ERCOT-26INR0109
Capacity
228 MW
Technology
Gas
Status
active
Location
Freestone, TX
Region
ERCOT
Developer
PIN OAK CREEK ENERGY CENTER, LLC
IA Status
IA Executed

Pin Peaking Energy Center 2 (TEF- Due Diligence)

ERCOT-26INR0109BetaActiveGasERCOTLBNL

228 MW generation in Freestone, TX · In queue since April 2023 · Proposed COD May 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

228 MW

Capacity

1

Components

Gas

3y 7m

In Queue

IA Executed

IA Phase

Signed May 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 1m

IA → COD

2 years

Total Duration

1y 1m

Schedule

7 months past proposed COD

Construction75%
Queue EntryApr 19, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementMay 30, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2026-05-01

Queue history
26INR0109 · 36 monthly ERCOT reports, Apr 2023 – Mar 2026

Projected COD moved

1 time

May 2026 → May 2026

Net change

0 months

first report to latest

Capacity

228 MW

unchanged in the reports

Latest stage

Commercial operation

last listed Mar 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 19, 2023
Facilities study approvedApr 23, 2024
Interconnection agreement signedMay 30, 2024
Approved for energizationNov 10, 2025
Approved for synchronizationFeb 26, 2026
Approved for commercial operationApr 29, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
May 2026
Developer in saved assessment
Constellation Energy
Filed as PIN OAK CREEK ENERGY CENTER, LLC
Status at research time
Online
Online — Hoodline reports Pin Oak Creek facility began operations in May 2026, first plant backed by Texas Energy Fund
Financing
Secured
Backed by Texas Energy Fund (TxEF) — $10B state program providing performance-based completion grants. POWER Magazine confirms first TxEF grant executed November 2025.

Milestones in this assessment

IA executedMay 30, 2024

Interconnection Agreement executed per LBNL queue data

ercot.com
Financing closeNov 2025

First Texas Energy Fund completion bonus grant agreement executed by PUCT

powermag.com
COD targetMay 2026Latest in this assessment

Pin Oak Creek facility began operations, first plant backed by Texas Energy Fund

hoodline.com
Research sources and reasoning (5 recorded sources)

high confidence at research time

  1. powermag.com/texas-issues-first-performance-based-grant-under-energy-fund-for-lcras-new-188-mw-rice-peaker/
  2. hoodline.com/2026/05/texas-10-billion-power-gamble-fires-up-first-gas-plant-near-fairfield/
  3. interconnection.fyi/project/ercot-26inr0109
  4. ercot.com/files/docs/2025/07/09/Capacity-Changes-by-Fuel-Type-Charts_June_2025_PlannedMonthly.xlsx
  5. ercotqueue.com/developer/pin-oak-creek-energy-center-llc

Commercial operation date: LBNL proposed COD of May 2026 is consistently confirmed across multiple ERCOT capacity planning documents from June 2025 through February 2026, all showing May-26 target. Hoodline article from May 2026 reports Pin Oak Creek facility (parent project) has begun operations, supporting the timeline.

Developer: LBNL filing entity is 'PIN OAK CREEK ENERGY CENTER, LLC' (project-specific LLC). Hoodline article from May 2026 explicitly identifies 'Constellation's Pin Oak Creek in Freestone County' as the operating parent company for the 460 MW facility, of which this 228 MW unit is part.

Status: While LBNL shows 'active' with IA executed May 2024, the May 2026 Hoodline article states 'Constellation's Pin Oak Creek in Freestone County...began operations, adding 460 MW' which encompasses this 228 MW unit. Interconnection.fyi also lists status as 'Operational'.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Calpine Freestone Peaker 2 (TEF-Due Diligence) project is a proposed 228 MW gas-fired generation project located in Freestone County, Texas. The developer is FPEC, LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0109, with a queue entry date of April 19, 2023, and a proposed commercial operation date of May 1, 2026.

The project has an Interconnection Agreement (IA) executed as of May 30, 2024. The Point of Interconnection (POI) is the 3134 RICHLAND CHAMBERS substation (PSS/E Bus Name: RICHLND1_5).

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Mar 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Freestone

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

PIN OAK CREEK ENERGY CENTER, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

3134 RICHLAND CHAMBERS (PSS/E Bus Name: RICHLND1_5)

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.