Douie Solar
221.2 MW generation in Freestone, TX · In queue since May 2023 · Proposed COD April 2028
221.2 MW
Capacity
1
Components
Solar
3y 6m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 11m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Completed, IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-04-18
Projected COD moved
3 times
Jun 2026 → Apr 2028
Net change
+22 months
first report to latest
Capacity
221 → 221 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
- 2026-04·Buffalo Spring Solar LLC→Electerracleanview.co
Milestones in this assessment
Electerra signed Standard Generation Interconnection Agreement with Oncor Electric Delivery for 224.6 MW Douie Solar project
cleanview.coERCOT capacity planning chart lists 2028 commercial operation date for 221.2 MW facility
ercot.comResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- cleanview.co/news/solar/electerra-signs-interconnection-agreement-for-224-6-mw-douie-solar-in-texas-20260409
- interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=35077&ItemMatch=Equal&DocumentType=ALL&SortOrder=Ascending&Page=2
- ercot.com/files/docs/2026/04/07/Capacity-Changes-by-Fuel-Type-Charts_March_2026.xlsx
- ercotqueue.com/developer/buffalo-spring-solar-llc
Commercial operation date: LBNL queue shows April 2028 COD. No independent news sources provide alternative dates; ERCOT capacity chart from April 2026 confirms 2028 target, suggesting LBNL date remains current.
Developer: LBNL filing entity is Buffalo Spring Solar LLC (project SPV). April 2026 Cleanview news reports 'Electerra Signs Interconnection Agreement for 224.6 MW Douie Solar', indicating Electerra is the operating parent company that acquired or developed the project.
Status: LBNL shows 'active' status with Facility Study stage. Texas PUC filings and Cleanview news confirm IA was signed April 9, 2026 with Oncor, advancing project beyond study phase.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Douie Solar project is a proposed 221.2 MW solar generation facility in Freestone County, Texas. Developed by Buffalo Spring Solar LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-26INR0098. The project entered the interconnection queue on May 15, 2023, and has a proposed commercial operation date of April 18, 2028. Its interconnection status is currently in the Facility Study phase.
The proposed project consists of 221.2 MW of solar photovoltaic generation. The point of interconnection is Tap 138 kV 3501 Sea way Teague - 3394 Jewett. The Douie Solar project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Freestone
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Buffalo Spring Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138 kV 3501 Sea way Teague - 3394 Jewett
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Douie Solar
Data-driven briefing on Douie Solar — fleet, generation, financial, and news signals.
RP SCG Texas Solar
Summary analysis with parallel narrative sections and visualizations.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.