Solarville Solar SLF (ERCOT-26INR0086) — Project Summary

Queue ID
ERCOT-26INR0086
Capacity
402.86 MW
Technology
Solar+Battery
Status
active
Location
Kaufman, TX
Region
ERCOT
Developer
Ville Solar, LLC
IA Status
Facility Study

Solarville Solar SLF

ERCOT-26INR0086BetaActiveSolarBatteryERCOTLBNL + Live

402.86 MW hybrid in Kaufman, TX · In queue since May 2024 · Proposed COD July 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

402.86 MW

Capacity

1

Components

Solar

2y 6m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 2m

Facilities Study50%
Queue EntryMay 20, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-07-01

Queue history
26INR0086 · 20 monthly ERCOT reports, Feb 2025 – Sep 2026

Projected COD moved

2 times

May 2028 → Jul 2029

Net change

+14 months

first report to latest

Capacity

400 → 403 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 20, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jul 1, 2029
From queue filing
Developer in saved assessment
Ville Solar, LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no interconnection agreement executed. ercotqueue.com puts the build chance at about 2%. A companion project, Solarville BESS SLF (28INR0432), was filed in November 2025 under the same developer.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/solar-farms/texas/26INR0086/solarville-solar-slf
  2. interconnection.fyi/project/ercot-26inr0086
  3. ercotqueue.com/project/26INR0086
  4. infrasure.ai/project/ercot-28inr0432-solarville-bess-slf

Commercial operation date: No news or press release gives a different COD. Cleanview's 'Expected online 2029' is consistent with the LBNL proposed COD of 2029-07-01, but it is probably derived from the same queue data, so it is not independent confirmation.

Developer: InfraSure and ercotqueue.com both name Ville Solar, LLC, but they appear to repeat the queue filing. No parent or operating company is identified, so Ville Solar, LLC is probably a project shell whose sponsor is unknown.

Status: LBNL lists the project as active. ercotqueue.com and interconnection.fyi both show it as active with no IA, and nothing indicates withdrawal or construction.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Solarville Solar SLF is a proposed solar-plus-battery hybrid development project located in Kaufman County, Texas. Developed by Ville Solar, LLC, the project has a total capacity of 402.86 MW. The data identifies both solar and battery storage technologies, but only the solar component's capacity, 402.86 MW, is listed, and no separate battery capacity is specified. The project is designed to connect to the grid via a tap on the 345 kV line between the #3123 Trinidad Switch and #2432 Tri Corner substations.

The project is listed in the Electric Reliability Council of Texas (ERCOT) interconnection queue under queue ID ERCOT-26INR0086. It entered the queue on May 20, 2024, and holds an active status. The project is in the Facility Study phase of the interconnection process and has a proposed commercial operation date of July 1, 2029.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Kaufman

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Ville Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV #3123 Trinidad Switch – #2432 Tri Corner.

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.