Zeppelin Energy Storage
163.93 MW storage in Tom Green, TX · In queue since January 2023 · Proposed COD May 2028
163.93 MW
Capacity
1
Components
Battery
3y 10m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 4m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-05-31
Projected COD moved
1 time
Feb 2026 → May 2028
Net change
+27 months
first report to latest
Capacity
161 → 164 MW
changed in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
San Angelo City Council approved three-year tax abatement (up to 85%) for $160M battery storage facility
sanangelolive.comProposed commercial operation date updated from Feb 2026 to May 2028
interconnection.fyiResearch sources and reasoning (5 recorded sources)
medium confidence at research time
- sanangelolive.com/news/san-angelo/2025-03-18/san-angelo-city-council-approves-160m-energy-storage-project-tax-abatement
- stateofthedivision.blogspot.com/2024/11/energy-storage-company-peregrine.html
- interconnection.fyi/project/ercot-26inr0083
- interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-ad5
- peureport.blogspot.com/2024/11/peu-energy-deals-hot-in-west-texas.html
Commercial operation date: LBNL queue shows May 31, 2028 COD. One search result mentions a prior target of Feb 15, 2026 that was updated to May 30, 2028, confirming the LBNL date is current. No financing-backed construction timeline announced yet.
Developer: LBNL filing entity is 'ZEPPELIN ENERGY STORAGE LLC' (a project SPV registered in California per search results). Multiple sources identify Peregrine Energy as the actual developer/operator behind the Zeppelin project.
Status: LBNL status is 'Active' with IA status 'Facility Study'. San Angelo City Council approved $160M tax abatement in March 2025, indicating project is advancing through permitting but not yet under construction.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The proposed Zeppelin Energy Storage project is a 163.93 MW battery storage development in Tom Green County, Texas. The project, being developed by Zeppelin Energy Storage LLC, is interconnected within the ERCOT region under queue ID ERCOT-26INR0083. It entered the interconnection queue on January 30, 2023, with a proposed commercial operation date of May 31, 2028. The project's interconnection status is currently in the Facility Study phase.
The Zeppelin Energy Storage project has been featured in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Tom Green
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
ZEPPELIN ENERGY STORAGE LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
6464 San Angelo North
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- POI Substation
- San Angelo North Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.