Charro Creek Storage 3 SLF (ERCOT-26INR0073) — Project Summary

Queue ID
ERCOT-26INR0073
Capacity
—
Technology
Battery
Status
active
Location
Karnes, TX
Region
ERCOT
Developer
Charro Creek Solar LLC
IA Status
—

Charro Creek Storage 3 SLF

ERCOT-26INR0073BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

— hybrid in Karnes, TX · In queue since January 2023 · Proposed COD December 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

—

Capacity

0

Components

3y 9m

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 11m

Pre-Study0%
Queue EntryJan 30, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-31

About

Charro Creek Storage 3 SLF (ERCOT queue ID 26INR0073) is a proposed battery energy storage development project in Karnes County, Texas. The project is being developed by Charro Creek Solar LLC and is classified as a hybrid project, with its technology components listed as battery energy storage and an additional component categorized as "Other." The individual capacities of these components and the project's total capacity are not specified in the available data. The project is planned to interconnect at a tap on the 345 kV transmission line between the Pawnee Switch (PAWNEESW5, bus 5725) and Coleto (COLETO7A, bus 8164) substations.

The project is in the interconnection queue of the Electric Reliability Council of Texas (ERCOT), which it entered on January 30, 2023. Its queue status is active, and it has a proposed commercial operation date of December 31, 2029. The available data does not indicate the status of an interconnection agreement for the project.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Karnes

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Charro Creek Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 5725 PAWNEESW5 - 8164 COLETO7A

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Pawnee

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Charro Creek Storage 3 SLF
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.