Fairway Storage
120.3 MW storage in Freestone, TX · In queue since November 2022 · Proposed COD September 2027
120.3 MW
Capacity
1
Components
Battery
4 years
In Queue
IA Executed
IA Phase
Signed Aug 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 9m
IA → COD
2y 1m
Total Duration
2y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Started, IA
Project under construction
Typical: 6–18 months
Proposed COD: 2027-09-24
Projected COD moved
5 times
Apr 2026 → Sep 2027
Net change
+17 months
first report to latest
Capacity
121 → 120 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Nofar USA and Qcells USA partnership announced to develop Fairway as part of 350MW/700MWh Texas BESS portfolio
power-technology.comStandard Generation Interconnection Agreement executed between Oncor Electric Delivery and Fairway Storage LLC
interchange.puc.texas.govERCOT capacity chart shows 120.3 MW Fairway Storage targeting 2027 COD
ercot.comResearch sources and reasoning (6 recorded sources)
high confidence at research time
- power-technology.com/news/nofar-qcells-energy-storage-texas/
- energy-storage.news/qcells-nofar-partner-on-texas-bess-totalling-350mw-700mwh/
- renews.biz/99555/nofar-qcells-team-up-for-350mw-texan-bess-projects/
- interconnectionfyi.substack.com/p/interconnectionfyi-weekly-digest
- ercot.com/files/docs/2026/02/05/Capacity-Changes-by-Fuel-Type-Charts_January_2026.xlsx
- interchange.puc.texas.gov/Search/Filings?ControlNumber=35077&ItemMatch=0&SortBy=ItemNumber&SortOrder=Descending
Commercial operation date: LBNL queue shows proposed COD of 2027-09-24, confirmed by ERCOT capacity chart (Feb 2026) showing 2027 target. Interconnection.fyi noted a slip from Feb 2027 to Sep 2027 in Dec 2024, consistent with current LBNL date.
Developer: LBNL filing entity is 'Fairway Storage LLC' (project SPV). Multiple March 2025 trade press sources (Power Technology, Energy-Storage.News, reNews) report Nofar USA and Qcells partnering to develop 'Fairway' as one of two 350MW BESS projects in Texas, indicating Nofar Energy is the operating parent.
Status: LBNL shows IA executed 2025-08-11, confirmed by Texas PUC filing showing Standard Generation Interconnection Agreement between Oncor and Fairway Storage LLC. Project is in active development phase per partnership announcements.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Fairway Storage is a proposed 121.03 MW battery storage project located in Freestone County, Texas. Developed by Fairway Storage LLC, the project consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0033, with a queue entry date of November 7, 2022, and a proposed commercial operation date of September 24, 2027. The project's interconnection agreement status is currently in the Facility Study phase.
The point of interconnection for Fairway Storage is Tap 138kV 3503 FAIRWPOD_8 - 196 FAIRFIELD. The project has appeared in recent news coverage regarding energy storage development in Texas.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Freestone
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Fairway Storage LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV 3503 FAIRWPOD_8 - 196 FAIRFIELD
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.