Fairway Storage (ERCOT-26INR0033) — Project Summary

Queue ID
ERCOT-26INR0033
Capacity
120.3 MW
Technology
Battery
Status
active
Location
Freestone, TX
Region
ERCOT
Developer
Fairway Storage LLC
IA Status
IA Executed

Fairway Storage

ERCOT-26INR0033BetaActiveBatteryERCOTLBNL + Live

120.3 MW storage in Freestone, TX · In queue since November 2022 · Proposed COD September 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

120.3 MW

Capacity

1

Components

Battery

4 years

In Queue

IA Executed

IA Phase

Signed Aug 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 9m

IA → COD

2y 1m

Total Duration

2y 9m

Construction75%
Queue EntryNov 7, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementAug 11, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2027-09-24

Queue history
26INR0033 · 44 monthly ERCOT reports, Feb 2023 – Sep 2026

Projected COD moved

5 times

Apr 2026 → Sep 2027

Net change

+17 months

first report to latest

Capacity

121 → 120 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedNov 7, 2022
Interconnection agreement signedAug 11, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Sep 2027
From queue filing
Developer in saved assessment
Nofar Energy
Filed as Fairway Storage LLC
Status at research time
IA Executed
IA Executed (Aug 2025) — development partnership with Nofar/Qcells announced Mar 2025, construction timeline targeting 2027 COD
Financing
Not recorded

Milestones in this assessment

Ownership changeMar 2025

Nofar USA and Qcells USA partnership announced to develop Fairway as part of 350MW/700MWh Texas BESS portfolio

power-technology.com
IA executedAug 11, 2025

Standard Generation Interconnection Agreement executed between Oncor Electric Delivery and Fairway Storage LLC

interchange.puc.texas.gov
COD targetSep 2027Latest in this assessment

ERCOT capacity chart shows 120.3 MW Fairway Storage targeting 2027 COD

ercot.com
Research sources and reasoning (6 recorded sources)

high confidence at research time

  1. power-technology.com/news/nofar-qcells-energy-storage-texas/
  2. energy-storage.news/qcells-nofar-partner-on-texas-bess-totalling-350mw-700mwh/
  3. renews.biz/99555/nofar-qcells-team-up-for-350mw-texan-bess-projects/
  4. interconnectionfyi.substack.com/p/interconnectionfyi-weekly-digest
  5. ercot.com/files/docs/2026/02/05/Capacity-Changes-by-Fuel-Type-Charts_January_2026.xlsx
  6. interchange.puc.texas.gov/Search/Filings?ControlNumber=35077&ItemMatch=0&SortBy=ItemNumber&SortOrder=Descending

Commercial operation date: LBNL queue shows proposed COD of 2027-09-24, confirmed by ERCOT capacity chart (Feb 2026) showing 2027 target. Interconnection.fyi noted a slip from Feb 2027 to Sep 2027 in Dec 2024, consistent with current LBNL date.

Developer: LBNL filing entity is 'Fairway Storage LLC' (project SPV). Multiple March 2025 trade press sources (Power Technology, Energy-Storage.News, reNews) report Nofar USA and Qcells partnering to develop 'Fairway' as one of two 350MW BESS projects in Texas, indicating Nofar Energy is the operating parent.

Status: LBNL shows IA executed 2025-08-11, confirmed by Texas PUC filing showing Standard Generation Interconnection Agreement between Oncor and Fairway Storage LLC. Project is in active development phase per partnership announcements.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Fairway Storage is a proposed 121.03 MW battery storage project located in Freestone County, Texas. Developed by Fairway Storage LLC, the project consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0033, with a queue entry date of November 7, 2022, and a proposed commercial operation date of September 24, 2027. The project's interconnection agreement status is currently in the Facility Study phase.

The point of interconnection for Fairway Storage is Tap 138kV 3503 FAIRWPOD_8 - 196 FAIRFIELD. The project has appeared in recent news coverage regarding energy storage development in Texas.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Freestone

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Fairway Storage LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV 3503 FAIRWPOD_8 - 196 FAIRFIELD

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform