Puerto Del Sol 1
213.8 MW generation in Cameron, TX · In queue since May 2022 · Proposed COD December 2026
213.8 MW
Capacity
1
Components
Solar
4y 6m
In Queue
Facility Study
IA Phase
COD target: 2026
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 7m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-31
Projected COD moved
0 times
Dec 2026 → Dec 2026
Net change
0 months
first report to latest
Capacity
215 → 214 MW
changed in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Proposed COD per LBNL queue filing and aggregator sites
cleanview.coResearch sources and reasoning (5 recorded sources)
low confidence at research time
- cleanview.co/planned-solar-projects/TX/26INR0008/puerto-del-sol-1
- ercotqueue.com/project/26INR0008
- cleanview.co/power-projects/developers/terra-gen
- renewablesinfo.org/project/ercot-26inr0008-puerto-del-sol-1
- interconnection.fyi/projects/state/TX/cameron-county
Commercial operation date: LBNL queue snapshot shows proposed COD of 2026-12-31. Multiple aggregator sites (Cleanview, ercotqueue.com) echo this December 2026 date, but no independent press releases or developer announcements found to validate or update it.
Developer: LBNL filing entity is 'PUERTO DEL SOL, LLC' (project shell). Cleanview's Terra-Gen pipeline page lists 'Puerto Del Sol 1' as a 214 MW solar project in Texas under Terra-Gen's development portfolio, indicating Terra-Gen is the operating parent company.
Status: LBNL status is 'active' at Facility Study stage (no IA date). No news of groundbreaking, financing, or withdrawal found. Status remains speculative early-stage development.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Puerto Del Sol 1 is a proposed solar generation project with a total capacity of 213.8 MW. Located in Cameron County, Texas, the project is being developed by PUERTO DEL SOL, LLC. It is currently in the ERCOT interconnection queue as entry ERCOT-26INR0008, with a queue entry date of May 16, 2022. The proposed commercial operation date is December 31, 2026, and the project's interconnection agreement status is currently in the Facility Study phase.
The project consists of 213.8 MW of solar photovoltaic generation. The point of interconnection is Tap 345kV 79500 Palmito - 79501 King Fisher Ckt 1. The project is listed as active in the ERCOT queue.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Cameron
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
PUERTO DEL SOL, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 79500 Palmito - 79501 King Fisher Ckt 1
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- POI Substation
- Palmito Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
RP SCG Texas Solar
Summary analysis with parallel narrative sections and visualizations.
Puerto Del Sol 1
Data-driven briefing on Puerto Del Sol 1 — fleet, generation, financial, and news signals.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.