Alamo Street BESS (ERCOT-25INR0763) — Project Summary

Queue ID
ERCOT-25INR0763
Capacity
9.99 MW
Technology
Battery
Status
active
Location
Pecos, TX
Region
ERCOT
Developer
Alamo Clean Energy Center, LLC
IA Status
IA Executed

Alamo Street BESS

ERCOT-25INR0763BetaActiveBatteryERCOTLBNL

9.99 MW storage in Pecos, TX · In queue since April 2025 · Proposed COD January 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

9.99 MW

Capacity

1

Components

Battery

1y 7m

In Queue

IA Executed

IA Phase

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

9 months

Schedule

10 months past proposed COD

Construction75%
Queue EntryApr 25, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2026-01-30

Queue history
25INR0763 · 7 monthly ERCOT reports, Jul 2025 – Jan 2026

Projected COD moved

2 times

Dec 2025 → Jan 2026

Net change

+1 months

first report to latest

Capacity

10 MW

unchanged in the reports

Latest stage

Commercial operation

last listed Jan 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Interconnection agreement signedDec 26, 2024
Approved for energizationNov 20, 2025
Approved for synchronizationDec 12, 2025
Approved for commercial operationFeb 10, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Alamo Street BESS (queue ID ERCOT-25INR0763) is a proposed battery energy storage development project located in Pecos County, Texas. The project is being developed by Alamo Clean Energy Center, LLC and has a total planned capacity of 9.99 MW, consisting entirely of battery storage. It is designed to interconnect as a new distributed energy storage resource (DESR) tied at 12.47 kV to the Alamo transmission service provider station (station code Alamo_ST). The station's load connection, Alamo_3, sits on PTI bus number 38331 at the 138 kV transmission level.

The project entered the Electric Reliability Council of Texas (ERCOT) interconnection queue on April 25, 2025, and currently holds an active status. An interconnection agreement has been executed, and the proposed commercial operation date is January 30, 2026. The project has been linked to an existing plant record in U.S. Energy Information Administration data, the Alamo Clean Energy Center (BESS) (EIA plant ID 69453), with a match confidence of 0.82.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Jan 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Pecos

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Alamo Clean Energy Center, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

New DESR on the coordinates above tie at 12.47kV to: TSP Station Name: Alamo TSP Station Code: Alamo_ST Load Name: Alamo_3 Bus #: PTI Bus Number: 38331 Voltage (Transmission level kV): 138kV Node (load/load XFMR in NMMS): 9643

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.