Hays Energy Unit 4 Repower
18 MW generation in Hays, TX · In queue since October 2024 · Proposed COD July 2028
18 MW
Capacity
0
Components
2 years
In Queue
—
IA Status
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-07-01
Hays Energy Unit 4 Repower is a proposed natural gas generation project located in Hays County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Developed by Hays Energy, LLC, the project would use combustion (gas) turbine technology and has a total proposed capacity of 18 MW. As its name indicates, the project is a repower of Unit 4 at the Hays Energy site. It is planned to connect to the grid at the 7043 Hays Energy 345 kV point of interconnection.
The project entered the ERCOT interconnection queue on October 29, 2024, under queue identifier ERCOT-25INR0695, and its status is currently listed as active. Its proposed commercial operation date is July 1, 2028. The available data does not specify the status of an interconnection agreement for the project.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Hays
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
HAYS ENERGY, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
7043 Hays Energy 345kV
Data Source
Live · ERCOT
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- HAYSEN1_2
- POI Substation
- Hays Energy Station
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Hays Energy Unit 4 RepowerForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.