Leon BESS (ERCOT-25INR0693) — Project Summary

Queue ID
ERCOT-25INR0693
Capacity
153.7 MW
Technology
Solar+Battery
Status
active
Location
Houston, TX
Region
ERCOT
Developer
Leon BESS
IA Status
Facility Study

Leon BESS

ERCOT-25INR0693BetaActiveBatteryBatteryERCOTLBNL + Live

153.7 MW generation in Houston, TX · In queue since November 2024 · Proposed COD February 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

153.7 MW

Capacity

1

Components

Battery

2 years

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 3m

Facilities Study50%
Queue EntryNov 26, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-02-16

Queue history
25INR0693 · 23 monthly ERCOT reports, Nov 2024 – Sep 2026

Projected COD moved

5 times

Jan 2027 → Feb 2028

Net change

+13 months

first report to latest

Capacity

154 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedNov 26, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Feb 2028
From queue filing
Developer in saved assessment
Misae Solar Parks
Filed as Leon BESS
Status at research time
Active
Active — Facility Study phase, IX Agreement expected February 2026 per developer materials
Financing
Not recorded

Milestones in this assessment

IA executedFeb 2026

Interconnection Agreement expected February 2026

misaesolar.com
COD targetFeb 2028Latest in this assessment

Commercial operation date targeted for February 2028

misaesolar.com
Research sources and reasoning (3 recorded sources)

medium confidence at research time

  1. misaesolar.com/copy-of-misae-energy-hub
  2. cleanusaenergy.io/wp-content/uploads/2026/02/Clean-USA-Energy-Executive-Summary-4-2-2026.pdf
  3. cleanview.co/planned-battery-projects/TX/25INR0693/leon-bess

Commercial operation date: LBNL queue date of 2028-02-16 is corroborated by Misae Solar Parks website stating 'February 2028 COD' and Clean USA Energy executive summary. No conflicting dates found in research.

Developer: LBNL filing uses 'Leon BESS' as entity name. Misae Solar Parks website lists Leon BESS as one of their BESS standalone projects with site control and development details. Clean USA Energy documents also reference the project, suggesting possible partnership or contracting relationship.

Status: LBNL status is 'Active' in Facility Study phase. Misae Solar Parks materials indicate IX Agreement targeted for February 2026, consistent with early-stage development.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Leon BESS project is a proposed 153.7 MW battery storage project located in Houston County, Texas. The developer is listed as Leon BESS. It is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0693, with a queue entry date of November 26, 2024. The proposed commercial operation date is February 16, 2028.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tab 138kv 3355 Grapeland_Magnolia - 3357 Pleasant_Springs. The project has appeared in recent news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Houston

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Leon BESS

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tab 138kv 3355 Grapeland_Magnolia - 3357 Pleasant_Springs.

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.