Elm Street BESS (ERCOT-25INR0655) — Project Summary

Queue ID
ERCOT-25INR0655
Capacity
9.9 MW
Technology
Battery
Status
active
Location
Reeves, TX
Region
ERCOT
Developer
Elm St Infra LLC
IA Status
IA Executed

Elm Street BESS

ERCOT-25INR0655BetaActiveBatteryERCOTLBNL

9.9 MW storage in Reeves, TX · Proposed COD April 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

9.9 MW

Capacity

1

Components

Battery

—

In Queue

IA Executed

IA Phase

Signed Jan 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

IA → COD

1y 3m

Schedule

8 months past proposed COD

Construction75%
Queue Entry

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJan 2, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2026-04-02

Queue history
25INR0655 · 16 monthly ERCOT reports, Mar 2025 – Jun 2026

Projected COD moved

6 times

Jan 2026 → Aug 2026

Net change

+7 months

first report to latest

Capacity

10 MW

unchanged in the reports

Latest stage

Commercial operation

last listed Jun 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Interconnection agreement signedJan 2, 2025
Approved for energizationJan 16, 2026
Approved for synchronizationMay 4, 2026
Approved for commercial operationJul 9, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Elm Street BESS (queue ID ERCOT-25INR0655) is a proposed 9.9 MW battery energy storage development project in Reeves County, Texas. The standalone storage project is being developed by Elm St Infra LLC and consists of a single battery component of 9.9 MW. The project is planned to interconnect at a 138 kV point of interconnection identified by station code ELM_ST (load name ELMST_2, bus number 38049).

The project is listed as active in the interconnection queue administered by the Electric Reliability Council of Texas (ERCOT). Its interconnection agreement was executed on January 2, 2025, and its proposed commercial operation date is April 2, 2026. The project has been linked to an existing plant record in U.S. Energy Information Administration (EIA) data, Elm Street BESS (EIA plant ID 69322), with a match confidence of 0.94.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Jun 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Reeves

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Elm St Infra LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Station Code: ELM_ST Load Name: ELMST_2 Bus # 38049 138kv

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
HIGH
Nearest Node (Estimated)
ELM_ST_RN
POI Substation
Pecos Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.