Zeus Mitchell BESS (ERCOT-25INR0589) — Project Summary

Queue ID
ERCOT-25INR0589
Capacity
1042.94 MW
Technology
Solar+Battery
Status
active
Location
Mitchell, TX
Region
ERCOT
Developer
Mitchell BESS
IA Status
Facility Study

Zeus Mitchell BESS

ERCOT-25INR0589BetaActiveBatteryBatteryERCOTLBNL + Live

1,042.94 MW generation in Mitchell, TX · In queue since May 2024 · Proposed COD April 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

1,042.94 MW

Capacity

1

Components

Battery

2y 6m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 11m

Facilities Study50%
Queue EntryMay 20, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-04-17

Queue history
25INR0589 · 17 monthly ERCOT reports, May 2025 – Sep 2026

Projected COD moved

2 times

Aug 2026 → Apr 2029

Net change

+32 months

first report to latest

Capacity

805 → 1043 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 20, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Apr 17, 2029
From queue filing
Developer in saved assessment
Mitchell BESS
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no IA executed. No public evidence of construction or permitting.
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-25inr0589
  2. cleanview.co/power-projects/planned/battery-storage-projects/texas/25INR0589/zeus-mitchell-bess
  3. ercotqueue.com/project/25INR0589

Commercial operation date: Only queue-derived data exists. interconnection.fyi repeats the 'proposed completion date April 17, 2029' and Cleanview says 'Expected online 2029', but both mirror the ERCOT filing rather than a developer announcement. The 2027 date on Cleanview belongs to the separate Zeus Mitchell BESS II (26INR0686) and was not used.

Developer: The LBNL filing, interconnection.fyi and ercotqueue.com all list 'Mitchell BESS' as developer. No press release or corporate source identifies a parent or operating company. The 'Zeus' branding hints at a sponsor, but nothing confirms it.

Status: LBNL and interconnection.fyi both show active, with IA status 'Facility Study' and no IA date. ercotqueue.com's 'Currently Construction' label conflicts with this and is unsupported by any news or developer source, so it was not adopted.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Zeus Mitchell BESS is a proposed battery energy storage development project in Mitchell County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The project is being developed by Mitchell BESS and has a total proposed capacity of 1,042.94 MW. Although the queue record classifies its technology as Solar+Battery, the only component listed is battery storage, which accounts for the full 1,042.94 MW. The project would connect to the grid at a tap on the 345 kV Ranger Camp (10049) to Prong Moss (10057) transmission circuits #01 and #02.

The project entered the ERCOT interconnection queue on May 20, 2024, under queue identifier 25INR0589, and its status is active. It is currently in the Facility Study phase of the interconnection process. The proposed commercial operation date is April 17, 2029.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Mitchell

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Mitchell BESS

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Range Camp Sub

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.